Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 2, 2026 at 7:00 PM
Updated January 3, 2026
Site work for a water / sewer project in Lake Elsinore, California. Completed plans call for site work for a water / sewer project.
**As of January 02, 2026, this project has not yet been awarded. The project is expected to be awarded on January 22, 2026.** Start/Delivery Date May 2026 Project Duration 300 calendar days Online Q&A Yes Q&A Deadline 11/18/2025 2:00 PM (PDT) The Bid Guarantee shall be submitted in a sealed envelope, addressed and delivered or mailed, postage prepaid, to the Engineering Department of the District before the time and day set for the receipt of bids. The Project includes the installation of approximately three thousand two hundred (3,200) linear feet of thirty-six (36)-inch sewer pipeline extending from the B-2 Lift Station to the existing forty-eight (48)-inch sewer in Malaga Road. The method of work will require portions of both tunneling and open-cut installation. The wastewater from this project will be directed to the Diamond Regional Sewer Lift Station. o The 36-inch Mission Trail Trunk Sewer Project is a key component of the broader effort to convert up to 696 homes in the Sedco Hills area from septic systems to a centralized sewer system and resolve the capacity issues of a portion of the existing 21-inch sewer line in Mission Trail. The wastewater from this project will be directed to the Diamond Regional Sewer Lift Station. o The work involves the installation of approximately 3,200 LF of 36-inch sewer pipeline extending from the B-2 Lift Station to the existing 48-inch sewer in Malaga Road. The method of work will require portions of both tunneling and open-cut installation. o Project includes, but not be limited to, open-cut pipeline trenching, managing tunneling subcontractors (if not prime contractor), trench shoring, pipeline installation, manhole construction, backfill and compaction, pavement restoration, traffic control, testing, permit compliance, and erosion control. o Construction will overlap with Sedco Hills Septic to Sewer Conversion Project Packages 1, 2 & 3, which discharge to the 36" trunk sewer in Mission Trail. Anticipated award on January 22, 2026
Bid Results
Water / Sewer
$15,052,288.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 25, 2025
May 1, 2026
Multiple Locations, Lake Elsinore, CA
Related To This Project
Lake Elsinore, CA
--
Lake Elsinore, CA
Bid Date: Aug 13 2025
Lake Elsinore, CA
Bid Date: Aug 12 2025
Lake Elsinore, CA
Bid Date: Aug 12 2025
Lake Elsinore, CA
Bid Date: Nov 05 2025
Lake Elsinore, CA
--
Lake Elsinore, CA
Bid Date: Sep 15 2025
Lake Elsinore, CA
Bid Date: Sep 16 2025
Lake Elsinore, CA
--
Lake Elsinore, CA
Bid Date: Jul 09 2025
Lake Elsinore, CA
Bid Date: Jul 09 2025
Lake Elsinore, CA
Bid Date: Jun 17 2025
Lake Elsinore, CA
Bid Date: Jun 18 2025
Lake Elsinore, CA
Bid Date: Jun 11 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
