Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 4, 2025 at 8:00 PM
Updated August 5, 2025
Site work for a road / highway in Hempstead, Texas. Completed plans call for site work for a road / highway.
As of August 4,2025, project was awarded to Northtex Construction, LLC, awarded amount is $4,191,429.44. Construction of Rough Cut and Mass Grading to serve Jasek Farms Phase 1, within Harris-Waller Counties M.U.D. No. 8. The deadline to ask questions is 7/09/2025 12:00 AM CST a. Under this Contract, Contractor shall furnish all materials, appliances, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction of the Work as described in these Technical Specifications and as shown on the Plans. The completed installation shall not lack any part that can be reasonably implied as necessary to its proper functioning or any subsidiary item that is customarily furnished, and Contractor shall deliver the installation to Owner in operating condition. b. The Work, in general, under this Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. Major items of construction and services required are designated as follows: (1) Install and adjust waterlines, valves, valve boxes, flushing valves, fittings, and appurtenances; (2) Construct and adjust sanitary sewer, manholes and appurtenances; (3) Repair existing pavement affected; (4) Furnish and install all subsidiary items as necessary to complete the project; (5) Perform testing as specified on installed lines; and (6) Clean-up project area upon completion. All work under this section shall include all equipment, labor and materials necessary for storing, handling, proportioning, mixing, placing, finishing and curing concrete. Concrete used in construction shall meet or exceed ACI Standard 318-89, "Building Code Requirements for Reinforced Concrete." This item shall include all labor, equipment, materials, and incidentals necessary to install cement stabilized sand as shown on the plans and shall be placed as specified herein or as directed by the Engineer. A. Stripping Within limits indicated, or in areas where existing grade is to be altered, and in other required locations, strip existing top soil to 4-inch depth, and stockpile in approved areas for subsequent replacement. B. Drainage Maintain surface drainage on site during construction. C. Finished Grade After all borrow material has been placed and compacted, the excess stockpiled top soil (that which is not needed for incidental backfill and/or shaping of the three landscape reserve areas) shall be evenly spread over the designated areas and compacted at or near (+/- 2%) optimum moisture to a minimum 95% of maximum density per ASTM Standard D-698.
Award
Roads / Highways
$4,191,429.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2025
August 11, 2025
To Be Determined, Hempstead, TX
Related To This Project
Hempstead, TX
Bid Date: Jul 28 2025
Hempstead, TX
Bid Date: Aug 07 2025
Hempstead, TX
Bid Date: Aug 12 2025
Hempstead, TX
Bid Date: Aug 08 2025
Hempstead, TX
Bid Date: Aug 07 2025
Hempstead, TX
Bid Date: Sep 09 2025
Hempstead, TX
Bid Date: Sep 26 2025
Hempstead, TX
Bid Date: Oct 24 2025
Hempstead, TX
--
Hempstead, TX
--
Hempstead, TX
--
Hempstead, TX
Bid Date: Jul 10 2025
Hempstead, TX
Bid Date: Jul 03 2025
Hempstead, TX
Bid Date: Jul 30 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
