BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 14, 2026 at 7:00 PM

Updated January 15, 2026

Site work and paving for a mixed-use development in Waverly, Ohio. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Waverly Gables Drainage Improvement Project Furnishing all labor, materials and equipment necessary to complete the project known as Waverly Gables Drainage Improvement Project The project involves the reconstruction of new curb, storm sewer, and regraded ditches along County Route 49 (Waverly Gables Blvd.). Pavement overlay and curb reconstruction of approximately 0.43 Miles of County Route 49 (Waverly Gables Blvd.), Dawn Lane, and Valley View Drive. Each bidder is required to furnish with its proposal, a Bid Guaranty and Contract bond in accordance with Section 153.54 of the Ohio Revised Code. Bid security furnished in Bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety. Each proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder must submit a complete listing of all subcontractors to be used. The owner intends and requires that all of this project except paving work be completed no later than November 30, 2025. ODOT Schedule of Liquidated Damages will be strictly enforced for completion date after November 30, 2025, Per ODOT State of Ohio Department of Transportation Construction and Material Specifications 2023, 108.07, Failure to Complete on Time Pg. 65-67 All contractors and subcontractors involved with the project will, to the extent practical use Ohio Products, materials, services, and labor in the implementation of their project. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123, the Governor's Executive Order of 1972, and Governor's Executive Order 84-9 shall be required. Bidders must comply with Davis Bacon wage rates on Public Improvements in Pike County. Only bids submitted by "Contractors prequalified with the Ohio Department of Transportation, Bureau of Contractor Qualifications" will be accepted on this project. In order for a contractor to be awarded a construction contract on this project, a current "Certificate of Qualification" must be submitted prior to award of the contract showing qualification to perform the type of work included in this construction contract. The amount of the Certificate of Qualification must exceed the amount of the bid on this project. Any bid submitted by a contractor who is not prequalified as required herein will be rejected. The Board of Pike County Commissioners reserve the right to waive irregularities and to reject any or all bids for the best interest of Pike County If you should have any questions regarding this project, please call.

Bid Results

Sidewalks / Parking Lot

$991,031.00

Public - County

Paving, Site Work

67

3

3

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
309
Active Projects
187
Bidding Soon
1,819
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2026

March 1, 2026

Project location map

Waverly Gables Rd, Waverly, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.