Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 29, 2025 at 8:00 PM
Updated September 30, 2025
Renovation of a power facility in El Centro, California. Working plans call for the renovation of a power facility.
As of September 29, 2025, bids were canceled. No definite date for the rebid. Professional engineering services for trail design, structural bridge design, preliminary permitting services, geotechnical services, and stakeholder coordination services. Services will support the development of a connector trail between the Minute Man National Historical Park's Battle Road Trail and Thoreau Farm on Virginia Road. 1. Meetings 2. Compile Existing Conditions and Trail Layout Drawings 3. Wetlands Resource Area Delineation Approval 4. Bridge and Trail Alternatives Analysis 5. Geotechnical Exploration 6. Preliminary Design Drawings and Report Question Deadline 08/12/2025 at 5:00 PM PT Questions concerning this Secondary Request for Proposal should be directed in writing to Mr. Marty P. Holbrook, purchasing agent, via email to: purchasing@iid.com. Time Period for Completed Project One year The method of Contractor Selection has not been Determined at this time.
Final Planning
Power Plant
$350,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 27, 2025
March 30, 2026
485 E Villa Ave, El Centro, CA
Related To This Project
El Centro, CA
Bid Date: Aug 25 2025
El Centro, CA
Bid Date: Jul 15 2025
El Centro, CA
Bid Date: Jul 17 2025
El Centro, CA
Bid Date: Jul 22 2025
El Centro, CA
Bid Date: Aug 07 2025
El Centro, CA
Bid Date: Jul 22 2025
El Centro, CA
Bid Date: Jul 21 2025
El Centro, CA
Bid Date: Aug 26 2025
El Centro, CA
Bid Date: Aug 07 2025
El Centro, CA
Bid Date: Jul 08 2025
El Centro, CA
Bid Date: Jul 30 2025
El Centro, CA
Bid Date: Jul 01 2025
El Centro, CA
Bid Date: Jun 26 2025
El Centro, CA
Bid Date: Jun 12 2025
El Centro, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
