Published August 8, 2025 at 8:00 PM

Updated August 9, 2025

Site work for a water / sewer project in San Diego, California. Completed plans call for site work for a water / sewer project.

Contractor will pay MTS the sum of $1,500 for each and every calendar day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture There are three existing single-walled USTs south of the Blue Barn: A. T001 (Oil) - 6,500 gal capacity oil tank currently holding 521 gals. B. T002 (North Diesel) - 20,000 gal capacity diesel tank currently holding 2,682 gal. C. T003 (South Diesel) - 20,000 gal capacity diesel tank currently holding 2,256 gal. These tanks are no longer in use and no known leaks have ever occurred. Each tank has a 6'x11' pump island with an adjacent 12'x20' secondary spill containment (within the freight yard track). Estimated Bid Value $217,342.00 Q&A Deadline 07/15/2025 5:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% All at grade and above grade appurtenances shall be removed including manhole covers, concrete pads surrounding manholes, vents, shutoffs, sump cover, sensors, consoles, alarms, pumps, pump islands, secondary containments, piping, and sumps. There are four (4) concrete pads roughly 8' x 8' and one (1) concrete pad roughly 13' x 8'. All grade areas where items were removed shall be backfilled and then in-filled with pavement and base to match and be flush with existing adjacent pavement sections and be verified in the field. All fuel monitoring systems above grade in the Blue Barn shall be removed in their entirety and the wall behind shall be repaired, patched and painted. Location and dimensions of the tanks and their appurtenances shall be traced and verified in the field. The contractor is responsible for restriping all striped lines removed or damaged as part of this project. The striping shall be re-striped with two coats of water based paint in conformance with the Caltrans Standard Specifications, 2015 edition Section 84-2.03C(3). Any new striping shall match the existing color and layout.

Award

Water / Sewer

$250,552.00

Public - County

Site Work

23

14

10

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
49
Bidding Soon
748
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2025

September 3, 2025

Project location map

2711 E Beyer Blvd, San Diego, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.