Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 10, 2025 at 8:00 PM
Updated September 11, 2025
Site work and paving for a road / highway in Sanger, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.
127EAW25R0030 - Disaster, Bush Loop Accessible Paved Trail Reion Sequoia National Forest FAR 32.204 Disclosure of Magnitude of the ion Project: Between 250,000 and 500,000 Set Aside: Total Small Business Set Aside IMPORTANT NOTES: Refer to Section L, Paragraph L.2, on Page 35 for detailed instructions regarding the submission of proposals, including the required documents and information to be provided. All Requests for Information (RFI's) shall be submitted to the Contract Specialist, Tanya Torres on the attached RFI form not later than 1000 AM hours PDT, August 5th, 2025. An organized will not be held.Contractors are encouraged to independently visit the site and submit any requests for information prior to the due date specified above. In no event shall failure to inspect the site constitute grounds for a claim after contract award. 127EAW25R0030 - Disaster, Bush Loop Accessible Paved Trail Reconstruction Sequoia National Forest FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $250,000 and $500,000 Set Aside: Total Small Business Set Aside IMPORTANT NOTES: Refer to Section L, Paragraph L.2, on Page 35 for detailed instructions regarding the submission of proposals, including the required documents and information to be provided. All Requests for Information (RFI's) shall be submitted to the Contract Specialist, Tanya Torres on the attached RFI form not later than 1000 AM hours PDT, August 5th, 2025. An organized site visit will not be held.Contractors are encouraged to independently visit the site and submit any requests for information prior to the due date specified above. In no event shall failure to inspect the site constitute grounds for a claim after contract award. The Contractor shall begin performance within 10 calendar days and complete it within 90 calendar days This project consists of furnishing all labor, materials, equipment, tools, transportation, incidentals, inspection, quality control and supplies necessary to reconstruct a 0.46-mile handicapped-accessible paved trail within a sensitive giant sequoia grove, which includes tasks such as vegetation trimming, removal of existing trail components, widening and repaving the trail with hot mix asphalt, and replacing drainage pipes. Additionally, the project requires seal coating the trail, constructing an accessible parking space with necessary signage, and ensuring all work aligns with environmental considerations. The Contractor shall be responsible for providing all labor, tools, material, and equipment necessary to perform all work in strict accordance with the specifications, drawings and industry standards. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for the items shown. See attachment "1. Statement of Work" for further details. C.2 PROJECT LOCATON Project location is in the State of California, County of Tulare, Sequoia National Forest, as described below. The trailhead is located at the end of FS road 20S78 Freeman Creek Grove, coordinates 36.149480, 118.5005767 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Roads / Highways
$270,473.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 18, 2025
September 17, 2025
To Be Determined, Sanger, CA
Related To This Project
Sanger, CA
--
Sanger, CA
Bid Date: Aug 19 2025
Sanger, CA
Bid Date: Aug 15 2025
Sanger, CA
Bid Date: Sep 02 2025
Sanger, CA
Bid Date: Sep 09 2025
Sanger, CA
Bid Date: Jul 08 2025
Sanger, CA
Bid Date: Jun 09 2025
Sanger, CA
Bid Date: Jun 12 2025
Sanger, CA
Bid Date: May 22 2025
Sanger, CA
Bid Date: Jun 26 2025
Sanger, CA
Bid Date: Apr 23 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
