BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Site work for a municipal facility in New Hartford, New York. Completed plans call for site work for a municipal facility.

Remove existing pavers and replace with concrete slab. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. This is a NYS Public Works project, and prevailing wages are to be paid, PRC# 2025007668. SCOPE OF WORK includes, but is not necessarily limited to the following: 1. Remove existing raised slabs 2. Cut away and remove any shrubs, roots or stone that will interfere with this work 3. Compact sub grade 4. Place a minimum of 4" inches of compacted crushed stone NYS DOT 304-1, type 4 5. Install reinforcing 6"x6" W1.4xW1.4 WWM wire mesh at a depth o f 2", anchor securely, using 16 gauge or heavier, black annealed wire. 6. gradation in base of framework. Apply in (2), 2" layers, compacting each layer. Refer to print. 7. Pin into existing concrete using #4 bar at 12" on center at least 8-12 inches of depth. Core drill to required depth, use a two-component required epoxy to set the #4 rebar and concrete bonding agent to additionally adhere the two slabs. 8. No concrete to be poured when temperature is expected to be below 40 degrees Fahrenheit. 9. Pour 5" of concrete. Concrete is to be air retained concrete with a minimum compressive strength of 4000 psi. aggregates No-1 crushed stone. Refer to print. 10. Consolidate concrete by spading, raking, forking, or using vibrator eliminating all air pockets, stones pockets and honey combing work. Float concrete surfaces so as to produce a uniform finish. 11. Provide a broom finish to all surfaces. 12. Finish edges of walks and expansion joints with a 1/4 " radius edging tool. Provide control joints every 5' 13. Apply anti curing and anti-spalling compound after finishing and when the surfaces if firm enough to walk on. Apply 2 coats at a combined coverage of 175 to 250 square feet per gallon. Sonneborn penetrating sealer or same quality product. Facility: New Hartford IRA Facility Address: 2 Alvin Place New Hartford 13413 Point of Contact: Jim Bell MS1 Contact Phone Number: 315-281-7760 Project Title: Replace raised concrete section Summary of Work: Remove and replace 'slab Page 2 of 4 14. Apply topsoil, grade and reseed any lawn damage when finished. 15. See site map for areas of replacement. 16. Comply with American concrete institute, ACU 301-72 work in this section. 17. Contractor shall follow all manufacturers specifications for all products used. 18. Work being performed will meet all applicable building codes.

Post-Bid

Municipal

$50,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
120
Bidding Soon
1,263
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2025

August 15, 2025

Project location map

2 Alvin Pl, New Hartford, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.