BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 9, 2025 at 8:00 PM

Updated August 10, 2025

Site work for a playground / park / athletic field in Union City, Georgia. Completed plans call for site work for a playground / park / athletic field.

Reference Number 0000391495 Question Deadline 07/22/2025 at 12:00 PM ET Questions are submitted online Yes Purchase Type Duration: 3 years The City is seeking Statements of Qualifications and Cost/Fee Proposals from firms interested in providing construction manager at risk (CMAR) services. CMAR services will revolve around the design and construction of the City's Reimagine Amphitheatre and Streetscape Project. General Requirements - Contractors License Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Union City reserves the right to reject any or all statements of qualifications, and to waive technicalities and informalities at their discretion. Required CMAR services will revolve around the design and construction of the City's Reimagine Amphitheatre and Streetscape Project as it is more fully described in Section 1.1 below. The selected CMAR is expected to provide services to complete Phase I described in Section 1.1 below and services, in conjunction with the designer and the City, to develop the schedule and to construct Phase II describe in Section 1.1 below. Questions should be directed to City of Union City, via Bidnet to: https://www.bidnetdirect.com/georgia/unioncity Phase 1 Phase I Amphitheatre Demo = $2,200,000.00 Phase II Phase II Amphitheatre Construction = $18,390,350.00 Streetscape = $10,915,800.00 Union City is planning to construct the Reimagine Amphitheatre and Streetscape Project along Mall Boulevard in Union City. The Project will include an amphitheater with a three-thousand (3,000) person seating capacity , a bandshell, a green room, a stand-alone restroom building, a stand-alone concession building, a stand-alone ticket booth building, necessary parking, a gateway entrance, a water feature, and a 0.75 mile streetscape that will include multi-use paths, lighting, landscaping, a roundabout, and realignment of an industrial park drive. The project will be constructed in two (2) phases. A phase III is anticipated. o Phase I will include demolition, tree removal, rock removal, and mass grading of the approximately 15-acre amphitheater site. o Phase II will include construction of the amphitheater facility and associated buildings, necessary parking, gateway entrance, water feature, infrastructure, streetscape, roundabout, and industrial drive realignment. Phase II scheduling in conjunction with the City and selected designer is an anticipated service for the selected CMAR. o Future Phase III will include two (2) multi-story mixed-use buildings along the frontage of Mall Boulevard. This scope is NOT to be included in this proposal and is provided for informational purposes only.

Post-Bid

Playgrounds / Parks / Athletic Fields

$31,506,150.00

Public - City

Site Work

4

12

13

7

Subscribe For Documents

91 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
21
Bidding Soon
1,523
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2025

December 12, 2025

Project location map

To Be Determined, Union City, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.