BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 6, 2025 at 7:00 PM

Updated November 7, 2025

Site work and paving for a civil project in Quebec, Quebec. Conceptual plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.

Construction of a rigid pavement on the Autoroute Félix-Leclerc (A-40) eastbound and westbound, between Boulevard Henri-Bourassa and Avenue du Bourg-Royal, including the rehabilitation of Bridge P-14407 and the replacement of lighting systems, in the City of Québec, Communauté métropolitaine de Québec, electoral divisions of Charlesbourg and Jean-Lesage. Project # 154230636 and 154230637. TIMELINE: Request for proposals for engineering services to complete design is closed. Reference number: 20081289. Proposals have been deposited and are under review. The engineers will carry out preliminary and final designs, preliminary and final plans and specifications and accompanying documents. Further update in winter, 2025/2026.

Conceptual

Bridges / Tunnels

$500,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
18
Bidding Soon
872
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2025

July 7, 2027

Project location map

Autoroute 40, Quebec, QC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.