BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 3, 2025 at 8:00 PM

Updated October 4, 2025

Site work for a civil project in Gurley, Alabama. Completed plans call for site work for a water / sewer project.

Prime contractor bidders will be refunded 100% of the plan deposit for one set returned to the Engineer, in reusable condition, within 10 days after the bid opening. Additional sets obtained shall be refunded 50% of the plan deposit. All non-bidders, subcontractors, vendors or dealers shall be refunded 50% of the plan deposit for each set returned to the Engineer, in reusable condition, within 10 days after the bid opening. The plan deposit amount as indicated above is in accordance with Alabama Act No. 97-225, (Title 39, Code of Alabama, 1975, As Amended), relating to the competitive bid laws for public works. All Bidders must comply with the requirements of the State Licensing Board for General Contractors (Latest Edition) and with the Alabama Act No. 97-225 (Title 39, Code of Alabama, 1975 as Amended) relating to competitive bid laws for public works. All Bidders must be properly licensed in accordance with the requirements of the State Licensing Board for General Contractors (Chapter 8, Title 34, Code of Alabama, 1975 or latest). Any contract or contracts awarded under this invitation for bids are expected to be funded by a loan from the State Revolving Fund from the Alabama Water Pollution Control Authority, administered by the Alabama Department of Environmental Management. Neither the State of Alabama, nor any of its departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. This procurement will be subject to regulations contained in the laws of the State of Alabama and as applicable. CONTRACT DOCUMENTS may be examined at the following locations; Town of Gurley, Gurley, AL Ladd Environmental Consultants, Inc., Fort Payne, AL Construct Connect Plan Room, 1-800-364-2059 Dodge Data & Analytics Separate sealed BIDS for the construction of Gurley Water System Improvements including 4,460' of 8" PVC Water Main, 50' of 6" PVC Water Main, 120' of 8" DI Water Main, 565' of Bore and Case with 12" Steel Casing, 4 EA 8" Gate Valves, 4 EA 6" Gate Valves, 8 EA Fire Hydrant and Valve, 4 EA 1" Air Release Valve, 7 EA Connection to Existing 6" Water Line with Tapping Sleeve and Valve, 6 EA Connection to Existing 6" Water Line, 6" Check Valve Station, Pressure Controlled Booster Pump Station and related items,)

Bid Results

Water / Sewer

$872,245.00

Public - City

Site Work

23

20

4

6

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
40
Bidding Soon
762
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2025

September 29, 2025

Project location map

Multiple Locations, Gurley, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.