Published August 12, 2025 at 8:00 PM

Updated August 13, 2025

Demolition, site work and new construction of a water / sewer project in North Myrtle Beach, South Carolina. Working plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

As of 8/12/2025, this project has been canceled in its entirety in the best interest of the City due to excessive material lead times and unforeseen challenges. No other changes are hereby made to this bid. The City intends to resolicit this project in February, 2026. 24th Avenue North Pump Station Relocation SCOPE OF WORK 1. If contaminated groundwater is encountered, work should be halted and the contractor shall notify the Owner, the Engineer, and SCDES immediately to allow evaluation of conditions by the Engineer, or his agent, and SCDES. No groundwater should be pumped, bailed, or otherwise discharged from the excavation. Any equipment or materials which come in contact with groundwater should not be removed from the immediate work area until potential levels of contamination have been assessed. 2. The proposed line being laid should be immediately sealed to prevent potentially contaminated water from flowing into the pipe. All workers should leave the excavation. Any equipment or other articles which have come into contact with the groundwater should be flushed with fresh water. 3. Samples of the groundwater will be collected by the engineer or his agent for testing. The constituent to be determined in the testing regime will be based upon the location with respect to the currently identified SWMUs (Solid Waste Management Units). Testing could include but is not limited to hydrocarbons, solvents, heavy metals, herbicides and pesticides. A work stoppage of 3 days should be anticipated for each such event. 4. If no contaminants are found, work can proceed. The volume of groundwater pumped from the excavation should be minimized. The engineer or his agent will sample periodically to determine if contamination is being transported from the SWMUs to the excavation via groundwater movement. 5. If the contamination is detected in the groundwater, any water removed from the excavation must be properly collected and stored for treatment. This collection will be undertaken by a qualified environmental contractor retained and paid for by the owner. Last Day for Questions: Tuesday, July 22, 2025, by 5:00pm

Final Planning

Water / Sewer

$800,000.00

Public - City

Demolition, New Construction, Site Work

27

16

2

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
37
Bidding Soon
585
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2025

February 12, 2026

Project location map

24th Ave N, North Myrtle Beach, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.