Published August 15, 2025 at 8:00 PM

Updated August 16, 2025

Site work and paving for a civil project in Rosenberg, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Scope of Work of the Contract includes the following: construction of the water, sanitary sewer, drainage, paving and appurtenances to serve Milo Farms Section 1. Anticipated start date is late August/Early September Phases 1 and 2 of the Milo Farms development consist of the development of about 217 acres of an approximately 410.2-acre site in Needville, Texas for single-family residential housing. Proposed construction includes mass grading, new roadways, underground utilities, detention/amenity ponds, a water treatment plant (WTP), a wastewater treatment plant (WWTP) with a lift station, and a recreation center. We understand the roadways will be paved with Portland cement concrete. Utilities will be on the order of 6 to 20 feet deep. The detention ponds are planned to be on the order of 13 to 23 feet deep. We understand the WWTP will consist of a 42-foot diameter clarifier, aeration and digester basins, a control building, a generator pad, and an approximately 25-foot deep lift station. The clarifier and aeration and digester basins will bear at a depth of about 7 feet below grade. The WTP will consist of two 32-foot-diameter steel ground storage tanks (GSTs), a hydropneumatic tank, an electrical/chlorine storage building, a booster pump pad, a water well, and a generator pad. The height of the GSTs were unknown at the time this report was prepared; we have assumed a typical height of 24 feet. Access roads for the WWTP and the WTP are planned to be surfaced with gravel. Q/A- Bidders desiring further information or further interpretation of any part of the Contract Documents are hereby obligated to submit a written request [online to www.CivCastUSA.com] for such information to Engineer not less than 7 calendar days before the Bid opening. Answers to these requests will be given, in writing, to all bidders as addenda to the Contract, and each addendum will be made a part of the Contract. No explanation or interpretation of the Contract, other than written addenda, shall be binding.

Award

Water / Sewer

$3,703,414.00

Public - County

Paving, Site Work

52

12

23

7

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
4
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2025

September 30, 2025

Project location map

To Be Determined, Rosenberg, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.