Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 26, 2025 at 8:00 PM
Updated July 27, 2025
Renovation of a fitness / recreation center in Shelton, Connecticut. Completed plans call for the renovation of a fitness / recreation center.
Question Deadline 07/14/2025 at 5:00 PM ET All questions related to this solicitation must be submitted in writing through the Citys OpenGov eProcurement Question/Answer Tab Sand/Finish Gym Floor at Mohegan School The City of Shelton ("City") is seeking competitive bids for the Sand/Finish Existing Gym Flooring at Mohegan Elementary School. The project must be completed prior to the new school year and before children return to school. cope of Work: Repair, sand & refinish existing gymnasium floor at Mohegan Elementary School PART 1: PART 1--GENERAL DESCRIPTION 1. Remove and Replace Existing Flooring in areas indicated. 2. There is to be approximately four hundred and ninety (490) square feet of new flooring patched into the existing floor. a. Locations are to be reviewed with Owner. The contractor will be responsible to confirm these areas and report any discrepancies to the Owner prior to the start of work. 3. All new flooring is to be "woven - in" to the existing flooring so that patched areas are not noticeable. 4. Replacement is to include all subfloor system components to match the existing subfloor system components. 5. New flooring is to be M.F.M.A. Ce11ified, Second Grade, 25/32" x 2 1/4" Tongue and Groove Maple Flooring 6. Complete Sand and Refinish of Existing Gymnasium Wood Flooring. a. The area will be clean, and all movable objects removed by the owner before work begins. b. Foot traffic must be eliminated by the owner for the duration of the project. QUALITY ASSURANCE 1. Floor Contractor/Installer Qualifications. 2. Submit a list of at least three completed projects of similar magnitude and complexity. 3. Flooring contractor shall be a firm in business for a minimum of ten (I 0) years. 4. Flooring Contractor shall be an MFMA Certified Installer. 5. Flooring Contractor must be a Bona Kemi Certified Craftsman installer/finisher. SUBMITTALS 1. Manufacturer's Product Data a. Submit three (3) Bona specifications sheets 2. Samples a. Submit one (I) sample of the Bona system, if requested by the owner. b. Maintenance Literature c. Submit three (3) copies of "MFMA Care and Preservation of Your Wood Floors." 3. Certification a. Suppliers shall submit certificates attesting that the materials furnished will meet specifications for grade and quality if required. PART 2: PART 2-- PRODUCTS MATERIALS 1. Flooring Materials a. Wood subfloor system components to match existing. b. Wood flooring to match existing 2. Finishing Materials a. Bona Kemi DTS sealer. b. Bona Kemi Super Sport Elite Gloss water based polyurethane finish. c. Bona Kemi Super Sport Paint PART 3--EXECUTION INSPECTION 1. Inspect the wood flooring for proper tolerance and dryness and report any discrepancies to the owner in writing. 2. Areas for repair are to be reviewed with owner to confirm prior to work commencing
Bid Results
Fitness / Rec Centers
$48,711.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 25, 2025
August 25, 2025
47 Mohegan Rd, Shelton, CT
Related To This Project
Shelton, CT
--
Shelton, CT
Bid Date: Oct 15 2025
Shelton, CT
--
Shelton, CT
Bid Date: Apr 07 2026
Shelton, CT
Bid Date: Jul 10 2025
Shelton, CT
Bid Date: Jul 07 2025
Shelton, CT
Bid Date: Jul 24 2025
Shelton, CT
Bid Date: May 29 2025
Shelton, CT
Bid Date: Jul 17 2025
Shelton, CT
Bid Date: May 23 2025
Shelton, CT
Bid Date: Apr 17 2025
Shelton, CT
Bid Date: Apr 16 2025
Shelton, CT
--
Shelton, CT
Bid Date: Mar 19 2025
Shelton, CT
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
