BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

Scope of Work of the Contract includes clearing and grubbing and construction of a gravity sanitary sewer system adjacent to West Lake Houston Parkway. The deadline to ask questions is 7/20/2025 10:00 AM CST A. Work to be performed under this item shall pertain to the protection of downstream watercourses (i.e., storm sewer system, ditches, wetlands, etc.) from sediment runoff caused by construction activities. The structures and protection shall be as shown on the plans or as directed by the Owner's Representative at various locations. B. Contractor is responsible for implementation of the Pollution Prevention Plan included in the contract documents, the requirements of the Texas Pollutant Discharge Elimination System General Permit for Construction Stormwater, and local storm water quality regulations. Section includes furnishing all labor, materials, equipment, power and incidentals for performing all operations necessary to dewater, depressurize, drain and maintain excavations and foundation beds as described herein and as necessary for construction of utilities, structures and appurtenances. Included are installing, maintaining, operating and removing dewatering systems and other approved devices for the control of surface and groundwater during the construction of open cut excavations, tunnels, access shafts, structures and appurtenances, and protecting work against rising waters and repair of any resulting damage. A. Waste material disposal consists of the following: 1. Disposal of trees, stumps, logs, brush, roots, grass, vegetation, humus, rubbish and other objectionable matter from operations such as clearing and grubbing, excavation and grading. 2. Disposal of unsuitable material or excess suitable material from roadway excavation, road side-ditch excavation, open cut excavation, tunnel excavation, site construction and/or ditch/pond excavation. 3. Disposal of material from work specified in the Plans or Specifications as removal and disposal. B. This section shall not apply to the disposal of contaminated material. C. Unless otherwise specified, the Contractor is responsible for removal and disposal of waste material. No separate payment will be made for work performed under this section. This section includes furnishing and installing piping, fittings, and appurtenances for public sanitary sewer systems. Pipe shall be of the size, type and location, and to the lines, grades and elevations shown on the Plans and constructed in accordance with the specifications.

Post-Bid

Water / Sewer

$500,000.00

Public - County

Site Work

14

9

2

8

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
378
Active Projects
204
Bidding Soon
3,532
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2025

August 21, 2025

Project location map

Multiple Locations, Houston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.