BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 21, 2025 at 8:00 PM

Updated July 22, 2025

This is a service / maintenance or supply contract in Pizarro, Washington. Contact the soliciting agency for additional information.

Adams County is soliciting interest from consulting firms with expertise in Civil Engineering Design. A&E consulting services agreement will be according to WSDOT actual cost-plus fixed fee agreement. This solicitation will be for one project. The duration of the agreement will be from approximately September 30, 2025, through December 31, 2027, with the option for Adams County to extend agreement for additional time and money if necessary. This project is scheduled for construction in Spring of 2026 and completion in Summer of 2026. Adams County reserves the right to amend terms of this Request for qualifications (RFQ) to circulate various addends, or to withdraw the RFQ at any time, regardless of how much time and effort consultants have spent on their responses. This project is federally funded and will be held to Federal requirements. The work to be performed by the Consultant will consist of multiple phases to include Preliminary Engineering, Construction Engineering and related subsequent work for the High-Volume Corridors Intersection Project. Work under this project will consist of Preliminary engineering / Design, of intersection traffic control improvements /countermeasures at 14 intersection locations for the purpose of installing, advance street name signs on the high-volume corridors, stop signs and advanced stop ahead signs on the intersecting roadways with a volume => 250 ADT. This project will expand upon the previous L.E.D. Enhanced Stop Sign installation project. Intersection marking updates and rumble strips will be placed at selected sites. Intersecting roadways with speeds <= 35mph may receive L.E.D. Stop/Stop Ahead sign upgrades at non-residential locations, and larger Stop/Stop Ahead signs in the residential locations. The major features of the project are as follows: Existing roadway sign survey. Design and plan development in Civil 3D/AutoCad dwg file and PDF. Preparation of preliminary plans, final contract plans and quantities. Bid Process Construction inspection, material testing and management. Adams County reserves the right to retain the services of the successful firm for any subsequent work related to any or all phases associated with this project. Adams County will supply the following information pertaining to the proposed project: County Road information as needed. Manage environmental permitting, concerns, and correspondence or coordination as needed. Submittals will be evaluated and ranked based on the following criteria; Qualifications/Expertise of Firm and Key personnel Ability to meet schedule Approach to project Familiarity with WSDOT/FHWA standards Familiarity with Adams County Past Performance/References Current approved ICR (Indirect Cost Rate) and approval letter from WSDOT Although the DBE goal for this project is ZERO (0), Adams County encourages Disadvantaged, Minority, and Women-owned consultant firms to respond. Any questions regarding this project should be directed to Scott Yaeger at Adams County Public Works, office (509) 659-3289, or email scotty@co.adams.wa.us

Conceptual

Roads / Highways

$1,000,000.00

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
28
Bidding Soon
528
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2025

Project location map

Multiple Locations, Pizarro, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.