BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 14, 2025 at 7:00 PM

Updated December 5, 2025

New construction of a laboratory facility in North Riverside, Illinois. Completed plans call for the construction of a 24,660-square-foot, one-story above grade laboratory facility.

The work consists of construction an approximately 5,460 SF conditioning office/lab building that connects to the existing lab (D0463) via a corridor. The scope of work provides for the construction of a heated drive-through equipment storage building, with wash bay, approximately 19,200 SF. Work will include drawings for equipment and wash bays, oil/water separator, and may include upgrading incoming electrical freed to the yard. The work also includes construction of an above-ground diesel fueling station with separate pump for diesel exhaust fluid. Trades included but not limited to: Selective Demo, CIP, Unit Masonry, Cast Stone Masonry, Structural Steel Framing, Steel Joist Framing, Metal Decking, Metal Fabrication, Bar Gratings, Carpentry, Plastic Laminate Clad Architectural Cabinets, Insulation, Air Barriers, PVC-KEE Membrane Roofing, Snow Guards, Firestopping, Joint Sealants, Acoustical Joint Sealants, Interior & Exterior Expansion Joint Cover Assemblies, D/F/H, Access Doors & Frames, Sectional Doors, Aluminum Framed Entrances & Storefronts, Glazing, Drywall, Ceramic Tiling, Acoustical Ceilings, Resilient Base, Accessories & Flooring, Quartz Flooring, Exterior & Interior Painting, Toilet, Bath & Laundry Accessories, Roller Window Shades, Countertops, Fueling Systems & Equipment, Fuel Management Systems, Pre-Engineered Metal Buildings, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Fire Detection & Alarm, Site Clearing, Earth Moving, Dewatering, Erosion & Sediment Control, Asphalt & Concrete Paving, Parking Bumpers, Pavement Markings, Tactile Warning Surfaces, Sie Furnishings, Turf & Grasses, & Site Utilities. Prevailing Wage. Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Prevailing Wage Act (820 ILCS 130/1-12). No work is allowed on the fuel island between the months of November and April Construct Buildings and Diesel Fueling Station, Upgrade Heating and Electrical. MBE/WBE Subcontracting and Supplier Goals Apply. PLA Applicable Yes Delivery Method Single Prime GOALS: The participation goal percentages on the amount of the contract awarded by CDB for this project are: 15% MBE/WBE and 1% VBE/PBE combined goals.

Award

Laboratories

$10,718,000.00

Public - State/Provincial

New Construction

165

31

116

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
460
Active Projects
251
Bidding Soon
3,349
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2025

November 17, 2025

Project location map

8660 Cermak Rd, North Riverside, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.