Published July 8, 2025 at 8:00 PM

Updated July 9, 2025

Renovation of a mixed-use development in Corbett, Oregon. Working plans call for the renovation of a hospitality development; and restaurant.

The Historic Multnomah Falls Lodge requires replacement of the existing walk-in cooler, freezer and produce cooler. This project is to demolish the existing three coolers, furnish and install new walk-in cooler with walk-in freezer and new produce cooler. Contractor to provide all labor and materials for demolition and complete functional installation. All work is to be done in accordance with applicable laws and regulations. Electrical work to be performed by licensed electrician in the state of Oregon. Contractor to obtain all permits required. All equipment furnished shall have a one-year warranty period from the date of start-up. Period of Performance: The demolition and installation shall occur no earlier than October 1, 2025 and be completed by February 28, 2026. Installation dates to be coordinated within 45 days of notice to proceed. Period of construction not to exceed 12 calendar days. The lodge is operated under permit by Multnomah Falls Co. Inc. (MFC). The lodge kitchen will remain open during construction. MFC will provide temporary cooler and freezer during the replacement of the walk-in coolers and freezer. Contractor shall coordinate installation times with MFC and the Contracting Officer to minimize disruptions to business operations. The following bid item descriptions are general saliant features requested of the coolers. Contractor to submit shop drawings, product data, ancillary equipment and anchor details for approval prior to release for construction. The associated contract drawings are for conceptual use only to show general layout and size required, under no circumstances are the drawings for construction use. The existing wet/glycol fire suppression system has four sprinkler heads within the walk-in freezer and cooler, and two in the ceiling space above. Contractor shall include replacement of these heads and associated draw down of the system, and bringing the system back to operational status. See attached fire suppression system as-builts. After installation of the new coolers the Contractor shall replace any interior kitchen wall, floor, or ceiling to restore to existing conditions. The magnitude of this construction project is between $100,000 and $250,000. THIS IS AN INFORMATIONAL NOTICE ONLY AND NOT A REQUEST FOR QUOTES. This notice is for the issuance of a blanket purchase agreement call request on Northwest Facilities Maintenance (FMAC) 1204M320Q0041. THIS IS A REQUEST UNDER A PREVIOUSLY ISSUED BPA. WE ARE NOT LOOKING TO ADD NEW CONTRACTORS TO THE BPA AT THIS TIME. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Hotel / Motel

$250,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
48
Bidding Soon
997
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2025

Project location map

53000 Historic Columbia River Hwy, Corbett, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.