Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 29, 2026 at 7:00 PM
Updated February 12, 2026
Renovation of an educational facility in Los Angeles, California. Completed plans call for the renovation of a educational facility.
Building A & B - Project to remove and replace all tiles and substrate for exterior areas that includes tiles, Redgard water proofing, mortar bed, lath, plaster, control joints, expansion joints and other metal trim associated with the tile assembly. Remove and replace flashing, parapet coping and bird deterrent. Remove and Reinstall CCTVs, PA speaker and light fixture on the exterior wall. The removal of the existing tile and substrate will require very specialized demolition in order to not compromise the existing vapor barrier of each building. Once the demolition is complete the application of the new lath and all accessories for the plaster system will need to be installed to fine tolerances on the large exterior elevations in preparation for the application of the new porcelain tile. Additionally, the installation of the new tile will need to also be installed to very fine tolerances to ensure an aesthetically acceptable finish that will last for the life of the bldg. All these subcontractors will need to demonstrate competence in this type of work and projects of a similar size. The District's Contract Bond Estimate is $ 1,662,000.00. Question Deadline 02/04/2026 For information or questions regarding this RFQ contact Felipe Torres at (213) 241-3148 or via email at fat3559@lausd.net and BVDBContracts@lausd.net. The District has adopted SBE and VBE participation programs. The District has established goals of 25% participation by certified SBEs, including micro-businesses, and 5% participation by VBEs, in the total contract amount. SBE, Micro-SBE, or VBE certified subcontractors, service providers, and material suppliers at all tiers may be counted in achieving these goals, but amounts passed through such certified SBEs and VBEs to non-SBE or non-VBE contractors, service providers, or materials suppliers shall not be counted in achieving participation goals.
Post-Bid
Educational
$1,662,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 11, 2026
March 2, 2026
3751 S Harvard Blvd, Los Angeles, CA
Related To This Project
Los Angeles, CA
Bid Date: Aug 18 2025
Los Angeles, CA
Bid Date: Jul 23 2025
Los Angeles, CA
Bid Date: Jul 15 2025
Los Angeles, CA
Bid Date: Jul 16 2025
Los Angeles, CA
Bid Date: Jul 28 2025
Los Angeles, CA
--
Los Angeles, CA
Bid Date: Jul 09 2025
Los Angeles, CA
Bid Date: Jul 14 2025
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
Bid Date: Nov 21 2025
Los Angeles, CA
--
Los Angeles, CA
Bid Date: Aug 11 2025
Los Angeles, CA
Bid Date: Jul 25 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
