Published August 27, 2025 at 8:00 PM
Updated August 28, 2025
Site work for a water / sewer project in Birmingham, Alabama. Completed plans call for site work for a water / sewer project.
In General, the Scope of Work Includes the Installation and Construction of Approximately Seven Thousand (7,000) Linear Feet of 16-inch Ductile Iron Gravity Sewer. Work Shall Include but is Not Limited to Abandonment of Approximately Four Thousand (4,000) Linear Feet of Existing 8-inch to 15-inch Sanitary Sewer, Abandonment of Eleven (11) Manholes, Installation of Gravity Sewer Lines, Approximately One Thousand Four Hundred and Sixty (1,460) Linear Feet of 30-inch or Greater Steel Encasement Pipe via Trenchless Crossing, and Installation of Twenty-one (21) New Manholes as Noted on the Plans and Specifications. The Contract Time for This Project is Four Hundred Fifty-five (455) Consecutive Calendar Days From the Effective Date of the Notice to Proceed. The First Ninety (90) Days of the Contract Time is an Administrative Period Followed by a Three Hundred and Sixty-five (365) Day Construction Period. The Time to Achieve Substantial Completion is Three Hundred and Thirty-five (335) Consecutive Calendar Days From Commencement of the Construction Period, and the Time to Achieve Final Acceptance is Three Hundred and Sixty-five (365) Consecutive Calendar Days From the Commencement of the Construction Period. If Mutually Agreed Upon Between the Owner and Contractor, the Construction Period May Commence Prior to the End of the Administrative Period. Upon Such Agreement the Contract End Date Will Be Modified Based on the Date of Termination of the Administrative Period. Liquidated Damages Will Be Assessed if This Time Limit is Exceeded. The Contractor May Apply for an Extension of Time in Accordance With the Provisions of the Contract; However, Such an Extension Must Be Approved Prior to the Contract Completion Date to Avoid the Imposition of Liquidated Damages. Questions Concerning Meaning or Intent of Bidding Documents Shall Be Submitted to Matt Tabor, Pe, Garver, at Email Mltabor@garverusa.com No Later Than 5:00 P.m. Local Time on Thursday, 08/14/2025 at 5:00 PM CT as per ADDA 2. All Questions Must Be in Writing on Bidder's Company's Letterhead or Email.
Bid Results
Water / Sewer
$7,226,225.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 27, 2025
October 25, 2025
5900 Messer Airport Hwy, Birmingham, AL
Related To This Project
Birmingham, AL
Bid Date: Jul 10 2025
Birmingham, AL
Bid Date: Jul 29 2025
Birmingham, AL
Bid Date: Jul 09 2025
Birmingham, AL
Bid Date: Sep 17 2025
Birmingham, AL
Bid Date: Jul 18 2025
Birmingham, AL
Bid Date: Sep 19 2025
Birmingham, AL
Bid Date: Aug 12 2025
Birmingham, AL
Bid Date: Aug 05 2025
Birmingham, AL
Bid Date: Jul 31 2025
Birmingham, AL
Bid Date: Jul 31 2025
Birmingham, AL
Bid Date: Jul 31 2025
Birmingham, AL
Bid Date: Jul 22 2025
Birmingham, AL
Bid Date: Jul 22 2025
Birmingham, AL
Bid Date: Jul 31 2025
Birmingham, AL
Bid Date: Jul 22 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.