Site work and paving for a mixed-use development in Moseley, Virginia. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; bridge / tunnel; and water / sewer project.
Woolridge Road Extension involves the construction of approximately 6,540 LF of a 4-lane divided roadway on new alignment from Old Hundred Road to Route 288 including dual two-lane bridges crossing Tomahawk Creek. The project will also include the construction of a roundabout at the intersection Old Hundred Road and Woolridge Road. The existing on/off ramp intersections at the Route 288 interchange with Woolridge Road will include traffic and pedestrian signals and extensions of the left turn lanes. Additionally, sidewalk will be installed on the east side of Woolridge Road from the southbound Route 288 intersection to Charter Park Drive. The project also includes the construction of four new stormwater management basins and retrofits of two existing stormwater management facilities. An existing 8" PVC sanitary sewer line will be extended by approximately 28 LF. The work will include, but not be limited to: clearing, grading, excavation, asphalt paving, concrete curb and gutter, bridges, drainage structures, erosion & sediment control, signal installation, lighting installation, signage, pavement markings, maintenance of traffic, installation of sewer main, and other items necessary for the completion of the work. Contractors must be on VDOT's current Pre-qualified list at the time/ date set for the opening of bids in order to be eligible for this contract. Project documents (Invitation for Bids, Project Manuals, Drawings, and any other applicable documents) provided electronically are solely for use by the Bidder for the convenience of preparing a bid response for the project. Electronic documents shall not be altered, and shall not be reproduced for any purpose other than the express purpose stated above. Any conclusion or information obtained or derived from such electronic files will be at the Bidder's risk. If there is a discrepancy between the electronic files and the hard copies on file with the County, the hard copies govern. If CAD files are available, the County does not release, nor authorize its engineering and design consultants to release them prior to execution of the Notice to Proceed. Evet Bid Description: Bids must be received by the County and then publicly opened and read 30 minutes thereafter. Doc note: Order documents by calling or emailing the office of A. Morton Thomas & Associates, Inc. and allow two business day for pickup and two business days for UPS delivery. Upon request, electronic documents will be provided via e-mailed download link File Transfer at no cost to the bidder, or provided on a CD or flash drive for a non-refundable fee of $15.00 if picked up or $25.00 if delivered. Please email akendall@amtengineering.com for a link to download the bid documents and plans. Question Deadline - 07/31/2025 at 5:00 PM ET - Please direct any and all questions regarding the Invitation for Bid, Virtual Pre-Bid Meeting, and/ or Invitation for Bid Documents in writing to A. Morton Thomas and Associates, Inc., Adam Kendall, PE, (email: akendall@amtengineering.com). Any and all questions and/ or requests for interpretation of bid documents must be submitted in writing to A. Morton Thomas and Associates, Inc., Adam Kendall, PE. 6,540 LF of 4-lane roadway on new alignment from Old Hundred Road to Route 288. o 685 LF Dual Bridges crossing Tomahawk Creek. o Construction of roundabout at existing intersection of Woolridge Road and Old Hundred Road. o Sidewalk from Route 288 to Charter Park Drive. o Woolridge Road intersections with Route 288 On/Off ramps include new traffic signals and turn lane modifications. o Lighting proposed at the roundabout and the Route 288 interchange intersections. o Four (4) proposed SWM Basins and two existing SWM Basin retrofits along Woolridge Road. o Reinforced Soil Slope (RSS) from Station 127+ 00 RT to Station 130+ 00 RT. o Landscaping and RPA & Wetland Reestablishment Seeding/Planting Plan. Curb o Design change from CG-3 / CG-7 to CG-2 / CG-6 as noted in the plans. o The Contractor shall install VDOT Standard CG-2 / CG-6 curb throughout the project limits except at the specific locations noted on sheet 2A(12). Refer to sheets 2A(12) and 2A(13) for additional details. o Plan sheet labels and typical sections correctly depict proposed curb and gutter type that shall be constructed. o Cross-sections depict CG-3 / CG-7 throughout and have not been revised to show CG-2 / CG-6 that shall be constructed. Elevations and offsets shall be field adjusted by Contractor to install CG-2 / CG-6. o Proposed drainage descriptions & storm sewer profiles (top elevations), and ditch typical sections (inverts) are based on CG-3 / CG-7 and shall be field adjusted by the Contractor. o It is the sole responsibility of the Contractor to make all necessary field adjustments to ensure all proposed CG-2 curb and CG-6 curb and gutter are installed at the correct offsets and elevations and to ensure all adjacent dimensions of the roadway typical section are maintained.
Award
Roads / Highways
$41,992,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2025
December 1, 2025
Woolridge Rd, Moseley, VA
Related To This Project
Moseley, VA
--
Moseley, VA
Bid Date: Aug 15 2025
Moseley, VA
--
Moseley, VA
--
Moseley, VA
--
Moseley, VA
--
Moseley, VA
--
Moseley, VA
--
Moseley, VA
--
Moseley, VA
--
Moseley, VA
--
Moseley, VA
--
Moseley, VA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.