BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 30, 2025 at 8:00 PM

Updated July 31, 2025

Site work and new construction of a fire / police facility in Worcester, Massachusetts. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

Request for Proposals - Construction Manager at Risk - New Worcester South Division Fire Station Project Pursuant to Chapter 149A of the General Laws, the City of Worcester requests proposals for Construction Management at Risk Services for the New Worcester South Division Fire Station Project. Firms which have been selected as qualified, may submit proposals to perform the Construction Management at Risk Services required by this Proposal and the attached documents. The City of Worcester intends to award a Construction Manager at Risk Contract that substantially conforms to the Construction Management Agreement, and the General Conditions of the Contract attached to this RFP, and the requirements of this Request for Proposal. The CM Contract will initially cover Pre-Construction Phase Services. A Guaranteed Maximum Price ("GMP") contract amendment will be negotiated prior to proceeding into Construction Phase Services. This Section includes requirements for the development of a Construction Indoor Air Quality Management Plan (herein referred to as the Plan). The Plan shall be developed by the Contractor and approved by the Owner and Architect. The Plan shall be implemented throughout the duration of the Project construction under the direction of the Contractor's IAQ Representative and shall be documented per the Submittal Requirements in Part 1 of this Section. A. Work Included: Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following: 1. All Mock-Up Masonry Work of Section 01 43 39, EXTERIOR MOCKUPS. 2. All Work of Section 04 20 00 - UNIT MASONRY 3. All Work of Section 04 43 13.13 - Anchored Stone Masonry Veneer. A. Work Included: Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following: 1. All Miscellaneous and Ornamental Iron Mock-Up Work of Section 01 43 39, MOCK-UP REQUIREMENTS. 2. All Work of Section 05 50 00 - METAL FABRICATIONS. 3. All Work of Section 05 51 13 - METAL PAN STAIRS 4. All Work of Section 05 52 13 - PIPE AND TUBE RAILINGS 5. All Work of Section 05 70 00 - DECORATIVE METAL 6. All Work of Section 05 73 00 - DECORATIVE METAL RAILINGS 7. All Work of Section 05 75 00 - DECORATIVE FORMED METAL. A. Work Included: Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following: 1. All Roofing and Flashing Work of Section 01 43 39, MOCK-UP REQUIREMENTS. 2. All Work of Section 07 13 26 SELF ADHERING SHEET WATERPROOFING 3. All Work of Section 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING. 4. All Work of Section 07 62 00 SHEET METAL FLASHING AND TRIM A. Work Included: Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following: 1. All Metal Window Mock-Up Work of Section 01 43 39, MOCK-UP REQUIREMENTS. 2. All Work of Section 08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 3. All Work of Section 08 44 13 GLAZED CURTAIN WALLS 4. All Work of Sectin 08 51 13 - ALUMINUM WINDOWS 5. Glazing and Work of Section 08 80 00 GLAZZING, where installed within the above Sections or Work. A. Work Included: Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following: 1. Interior Work of Section 08 80 00 - GLAZING. A. Work Included: Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following: 1. Painting Work of Section 01 43 39 MOCKUP REQUIREMENTS 2. All Work of Section 09 61 16 CONCRETE FLOOR SEALING 3. All Work of Section 09 91 14 EXTERIOR PAINTING. 4. All Work of Section 09 91 23 INTERIOR PAINTING 5. All Work of Section 09 96 00 HIGH PERFORMANCE COATINGS 6. All Work of Section 09 96 56 EPOXY WALL COATINGS A. Work Included: Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following: 1. All Work of Section 09 30 13 TILING. A. Work Included: Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following: 1. All Work of Section 09 51 13 ACOUSTICAL PANEL CEILINGS. 2. All Work of Section 09 77 13 STRETCHED-FABRIC WALL SYSTEMS A. Work Included: Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following: 1. All Work of Section 09 65 13 RESILIENT BASE AND ACCESSORIES. 2. All Work of Section 09 65 19 RESILIENT TILE FLOORING 3. All Work of Section 09 65 36 STATIC-CONTROL RESILIENT FLOORING 4. All Work of Section 09 65 66 RESILIENT ATHLETIC FLOORING A. Work Included: Provide labor, materials and equipment necessary to complete all work of this Section. B. Specific additional Scopes of Work required for this Trade Contractor are defined in the Consigli Bid Package #3: Construction Documents Supplemental Instructions to Bidders, Specification Section 00 22 03. C. Alternates: Alternate No. 2, Spartan Stadium The Work consists of all the work identified in the Contract Documents. The Work comprises the completed construction required by the Contract Documents and includes all labor, tools, materials, supplies, equipment, permits, approvals, paperwork, calculations, submittals, and certificates necessary to develop, construct and complete the Work in accordance with all Laws, and all construction and other services required to be supervised, overseen, performed or furnished by CM or that the Contract Documents require the CM to cause to be supervised, overseen, performed or furnished. The CM shall provide and perform for the Contract Price all of the duties and obligations set forth in the Contract Documents. A. Furnish and install the following, as shown on the Drawings and specified herein: 1. Phenolic lockers. 2. Locker benches.

Post-Bid

Fire / Police

$39,000,000.00

Public - City

New Construction, Site Work

171

26

44

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
706
Active Projects
373
Bidding Soon
4,955
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2025

November 1, 2025

Project location map

25 Madison St, Worcester, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.