BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2025 at 8:00 PM

Updated August 13, 2025

Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

"Fort Bend County MUD No. 231Wastewater Treatment Plant No.1 for Fort Bend County Municipal Utility District-No.231." Construction of a 120,000gallon per day concrete wastewater treatment plant;construction of a complete electrical system; site work including grading, drainage,and driveways; construction of a 6-foot diameter lift station with duplex pumps and local electrical panel, installation of an emergency standby generator with automatic transfer switch, complete in place.Bids received after closing time will not be considered. Each Bid must be accompanied by a Bid Bond or a certified or cashier's check,acceptable to the Owner,in an amount not less than two percent (2%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract Documents and execute the Bonds on the forms provided and provide the required insurance certificates within seven(7) days after the date Contract Documents are received by the Contractor. Checks should be made payable to Odyssey Engineering Group, LLC. Nocash will be accepted. Question Deadline: 07/30/2025 10:00 AM Submit all questions via online. Any emailed questions will not be answered. All questions must be submitted (48 hours prior to bid). Any questions submitted or emailed after that date will not be answered. Under this Contract, Contractor shall furnish all materials, appliances, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction of the Work as described in these Technical Specifications and as shown on the Plans. The completed installation shall not lack any part that can be reasonably implied as necessary to its proper functioning or any subsidiary item that is customarily furnished, and Contractor shall deliver the installation to Owner in operating condition. b. The Work, in general, under this Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. Major items of construction and services required are designated as follows: Construction of a 120,000 gallon per day concrete wastewater treatment plant; construction of a complete electrical system; site work including grading, drainage, and driveways; construction of a 6-foot diameter lift station with duplex pumps and local electrical panel, installation of an emergency standby generator with automatic transfer switch, complete in place. Work under this contract includes: Construction of a 6-foot wet well with duplex pumps rated at 416 gpm; Construction and installation of a complete electrical system; A diesel standby generator with subbase fuel tank and automatic transfer switch; Security fencing; and All weather access surface.

Bid Results

Water / Sewer

$6,495,508.00

Public - County

Site Work

27

25

142

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
4
Bidding Soon
2,266
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2025

September 1, 2025

Project location map

To Be Determined, Houston, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.