Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 14, 2026 at 8:00 PM
Updated October 20, 2026
Site work, paving, outdoor lighting and new construction of a mixed-use development in Goodyear, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; for outdoor lighting for a road / highway; for the construction of a bridge / tunnel; bridge / tunnel; and bridge / tunnel.
**As of October 14, 2026, this project has not yet been awarded. The project is expected to be awarded in the month of November 2026.** 024 MA 024 Gateway Freeway (SR 24) (SR 202L Ironwood) The proposed project is located within Maricopa and Pinal Counties on SR 24 and SR 202L. The project limits extend east and north from Recker Road to Guadalupe Road along SR 202L and east from SR 202L to Ironwood Drive along SR 24, between SR 202L MP 31.60 to MP 37.59 and SR 24 MP 0.00 to MP 5.64, within the City of Mesa, Town of Gilbert, Town of Queen Creek, Maricopa County, and Pinal County. The work consists of widening SR 24 and SR 202L to add general purpose lanes, constructing new system interchange ramp connections between SR 202L and SR 24, and reconstructing Ironwood Drive to a diverging diamond interchange. The work includes removing existing pavement and roadway edge treatments on SR 202L and SR 24 required to construct new roadway widening. Roadway work includes excavation, borrow material, embankment, concrete and asphaltic concrete paving, new concrete bridges, concrete bridge widening, retaining walls, sound walls, storm drain, catch basins, landscaping, erosion control, AC friction course removal, concrete pavement diamond griding, AC milling, pavement markings, signing, traffic signals, lighting, FMS, and other related work. Central District Item # 104373 Engineering Specialist: Patwary Mohammed The time allowed for the completion of the work included in the Construction Phase of the contract will be 940 calendar days. The time allowed for the completion of the work included in the Landscape Establishment Phase of the contract will be 365 calendar days. Question Deadline - 09/01/2026 - The Department May Not Answer All Questions, and Any Decision on Whether a Question is Answered Will Be Within the Sole Discretion of the Department. Any Questions Received Less Than Three Working Days Prior to The Bid Opening Date May Not Be Answered. The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. AZDOT - Capacity Additions (Major Widening) - Multiple Locations PN - 024 MA 000 F071901C
Bid Results
Roads / Highways
$267,876,760.00
Public - State/Provincial
New Construction, Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 2, 2026
December 1, 2026
Multiple Locations, Goodyear, AZ
Related To This Project
Goodyear, AZ
--
Goodyear, AZ
--
Goodyear, AZ
--
Goodyear, AZ
--
Goodyear, AZ
Bid Date: Aug 05 2025
Goodyear, AZ
--
Goodyear, AZ
Bid Date: Feb 13 2026
Goodyear, AZ
Bid Date: Aug 07 2025
Goodyear, AZ
--
Goodyear, AZ
--
Goodyear, AZ
Bid Date: Jul 15 2025
Goodyear, AZ
Bid Date: Jun 26 2025
Goodyear, AZ
Bid Date: Jul 02 2025
Goodyear, AZ
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed