Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 28, 2025 at 8:00 PM
Updated July 29, 2025
Renovation of a military facility in Camp Lejeune, North Carolina. Completed plans call for the renovation of a military facility.
N40085-25-D-2517, N40085-25-D-2518, N40085-25-D-2519, N40085-25-D-2516 SCOPE OF WORK: The contractor shall provide all material, labor, equipment, and supervision required to accomplish the following: GENERAL DESCRIPTION The responsibility of the contractor is to repair building FC415 as listed in the project area description according to the general requirements. All measurements are for reference only and are to be field verified by contractor. See attached quantity sheet. The point of contact for access to the building is listed below in the project area descriptions. DETAILED REQUIREMENTS AND SPECIFICATIONS 1.) General Requirements (As Applicable) a. Repair all cracks, holes, and damaged surfaces to provide a solid foundation for painting. If there are significant repairs needed (greater than 100 S.F.), it shall be noted below in the project area description. b. Clean and treat mold and mildew areas for finish coating application. c. Apply interior / exterior finish surfacing compound as appropriate to any damaged surfaces to match surrounding finishes. d. All finish colors shall match as close as possible the existing colors unless otherwise noted in the project area description section. e. f. Replace any damaged or rotten trim boards, siding, or moldings, as quantified in the work area descriptions. Replace any loose, damaged, or missing caulking and glazing compound on windows, doors and other surfaces on the interior and exterior. Secure any loose trim boards, siding, or moldings that are not damaged or rotten. g. All repaired surfaces will be primed with latex KILZ 2 or equivalent unless otherwise noted in the project area description section. h. All metal surfaces shall have (2) coats of latex direct to metal semi-gloss finish paint applied unless otherwise noted in the project area description section. i. j. All interior wall surfaces shall have (2) coats of eggshell / satin finish latex paint applied unless otherwise noted in the project area description section. All wood trim and doors shall have (2) coats of semi-gloss latex finish paint applied unless otherwise noted in the project area description section. k. All wood trim with natural finishes shall be sanded for finish appearance and (2) coats of polyurethane finish coat shall be applied areas unless otherwise noted in the project area description section. l. All exterior masonry surfaces shall have (2) coats of Loxon masonry coating or equivalent applied unless otherwise noted in the project area description section. m. All EFIS finishes shall have (2) coats of Semi-gloss latex finish paint unless otherwise noted in the project area description section. n. All high bay areas shall have (2) coats of a high gloss coating applied to provide maximum illumination of the work areas unless otherwise noted in the project area description section. o. Apply KILZ 2 or equivalent primer sealer and (2 )coats of mildew resistant latex semi-gloss finish paint to all previously painted surfaces in the bathroom areas unless otherwise noted in the project area description section. p. Due to inadequate adhesion of previously painted finishes additional scrapping and preparation shall be required for all wood, masonry and metal surfaces. q. No roof surfaces are to be painted unless otherwise noted in the project area description. r. Cover all furniture, possessions, and building components as required protecting them from damage during accomplishment of interior and exterior painting. The contractor shall be responsible for the removal and resetting of all furniture. This includes any required disassembling and reassembling of furniture. s. t. The contractor shall provide a storage container on site to store furniture and other large items to keep them from being damaged during the work process. If work can be completed with furniture items in the center of the room and properly covered to ensure they are not damaged, then there is no need for a container to be utilized. Remove and reinstall all electrical/data switch and receptacle covers, to insure all previously painted surfaces are repainted. u. Paint over existing painted stenciled signage and replace with newly painted stenciled signage with the same lettering or numbering. v. Repaint all exposed piping and piping insulation. Stencil proper markings on piping. w. Clean all over-spray, drips, splatters and spills resulting from accomplishing this project from all surfaces as appropriate. x. Previously painted concrete floors shall be painted with Sherwin Williams Rexthane I Floor paint or equivalent. Concrete sealer shall be applied (Ardex Sealer) or equivalent prior to floor painting. The floors shall be clean dry and dull prior to all applications. y. No glass surfaces are to be painted unless otherwise noted in the project area description area. z. Special scheduling shall be required on all the buildings listed below. Approximately _ of the work areas shall be available for paint at one given time. It is the responsibility of the contractor to coordinate a schedule with the point of contact for each building. aa. The statement that all surfaces tested positive or negative for lead paint means that all surfaces are to be assumed as positive or negative as listed in the project area description section of this scope. bb. The intent of this project is not to abate the lead paint. The intent is only to remove the lead paint to the extent necessary to prep for a new coat of paint. cc. All paint and prep work shall comply with the attached painting and coating specifications as applicable. 2.) Project Area Description a. Building FC415 is a BEQ building located on Conner Street. i. Pressure wash all exterior surfaces of building. This shall include balconies and stairwells underneath and overhead. ii. iii. Repair all chipped or spalling concrete throughout interior or exterior of building with Belzona 4141 epoxy filler or equivalent. This area is mainly in the first-floor laundry area. Paint all previously painted interior and exterior surfaces throughout the building. This shall include doors, lintels, stairwells, exposed pipe, conduit, handrails, structural metal etc. iv. Replace all door sweeps on all existing exterior doors throughout the facility. v. Replace all existing window locks on all sliding windows throughout the facility. vi. Cover all exterior devices which may be damaged by water intrusion when power washing building. vii. Ceiling paint Sherwin Williams SW-7102 White Flour or equivalent. viii. Metal doors frames, lintels, exterior window trim paint color Sherwin Williams SW- 7026 River Reflections or equivalent. ix. Interior room / stairwell wall color Benjamin Moore BM-1552 River Reflections or equivalent. x. Previously painted yellow safety surfaces color Rustoleum Safety Yellow 7543 or equivalent. xi. The building tested positive for lead in areas with yellow safety paint in stairwells. xii. The point of contacts for access to the building is Katelyn E Cardona at Katelyn.e.cardona@usmc.mil and SSgt Guarin G. Folsom at work (910) 451-0832 or cell (619) 772-7612 The responsibility of the contractor is to repair building FC415 as listed in the project area description according to the general requirements. All measurements are for reference only and are to be field verified by contractor. See attached quantity sheet. The point of contact for access to the building is listed in the project area descriptions. SPECIAL SCHEDULING The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations of the facility/activity. The furniture and other objects in the room are to be moved by the contractor. SUPERVISION One person may fill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer, if duly qualified for all three positions as defined in the project specification. NAVFAC Solicitation No.: N40085-25-R-9002 Public Works Project No.: 25-0407 Title: Building FC415 Repairs Contract Completion Date: 240 days after award Estimated Cost Range: Between $250,000 and $500,000 Wage Determination: General Decision Number: NC202500100 01/03/2025 Liquidated Damages: $880 per Calendar Day RFIs must be submitted to brandi.l.porche.civ@us.navy.mil. The cut off for RFIs is July 14, 2025 by 3:00 PM EST in order to process all inquiries by the proposal due date. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Requests for Information (RFIs): RFIs must be submitted to brandi.l.porche.civ@us.navy.mil. The cut off for RFIs is July 14, 2025 by 3:00 PM EST in order to process all inquiries by the proposal due date.
Post-Bid
Military
$500,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
10
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 28, 2025
September 26, 2025
Multiple Locations, Camp Lejeune, NC
Related To This Project
Camp Lejeune, NC
Bid Date: Aug 12 2025
Camp Lejeune, NC
Bid Date: Aug 06 2025
Camp Lejeune, NC
Bid Date: Aug 08 2025
Camp Lejeune, NC
Bid Date: Aug 08 2025
Camp Lejeune, NC
Bid Date: Aug 13 2025
Camp Lejeune, NC
Bid Date: Aug 27 2025
Camp Lejeune, NC
Bid Date: Sep 08 2025
Camp Lejeune, NC
Bid Date: Dec 10 2025
Camp Lejeune, NC
Bid Date: Aug 19 2025
Camp Lejeune, NC
Bid Date: Jul 31 2025
Camp Lejeune, NC
Bid Date: Aug 14 2025
Camp Lejeune, NC
Bid Date: Jul 17 2025
Camp Lejeune, NC
Bid Date: Aug 05 2025
Camp Lejeune, NC
Bid Date: Jul 18 2025
Camp Lejeune, NC
Bid Date: Jul 14 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
