BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 6, 2025 at 8:00 PM

Updated August 7, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Frankfort, Kentucky. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

**As of August 6, 2025, bids were canceled. No definite date for the rebid.** **As of August 6, 2025, bids were canceled. No definite date for the rebid.** Boyd County Fiscal Court is requesting bids for Johnson Fork Bridge Replacement. The scope of the work is for the replacement of 1 bridge on Johnson Fork (CR 1011) in Boyd County, KY. This work includes the demolition of an existing bridge, construction of a new HL-93 structure with a minimum clear span of 33 feet, a minimum roadway width of 24 feet, and a minimum hydraulic opening of 165 square feet. The contractor shall submit draft plans of the intended structure with an all-inclusive lump sum bid. Johnson Fork may only have a total closure of sixty (60) calendar days. The scope of the work is for the replacement of 1 bridge on Johnson Fork (CR 1011) in Boyd County, KY. This work includes the demolition of an existing bridge, construction of a new HL-93 structure with a minimum clear span of 33 feet, a minimum roadway width of 24 feet, and a minimum hydraulic opening of 165 square feet. The contractor shall submit draft plans of the intended structure with an all-inclusive lump sum bid. Johnson Fork may only have a total closure of sixty (60) calendar days. ASE BID: General Conditions Maintain and Control Traffic to include all items related to traffic control and road closures of all work areas. (See project notes for traffic control and work restrictions.) Erosion Control line item to include all items necessary to adhere to all KPDES regulations. (See special note relating to Erosion Control.) Question Deadline Jul 16, 2025 Every request for such interpretation should be in writing addressed to The Engineer and to be given consideration must be received by 12:00 PM - 3 days prior to the date fixed for the opening of bids. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the specifications which, if issued, will be emailed to all prospective bidders (at the respective addresses or email furnished for such purposes)

Final Planning

Bridges / Tunnels

$500,000.00

Public - County

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
79
Bidding Soon
1,707
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2025

August 18, 2025

Project location map

Johnson Fork road, Frankfort, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.