BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 6, 2025 at 8:00 PM

Updated September 7, 2025

Site work and paving for a bridge / tunnel in Strasburg, Colorado. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Region: 1 Counties: Arapahoe Guaranty: 5% of Total Bid It is estimated that the total cost of all items in the bid will be: (X) Between $5,000,000 and $20,000,000 Contract UDBE Goal: 0.00 % Fixed Completion Date: 8/7/2026 This project is located in Region 1 in Arapahoe County. Project work consists of bridge repair and deck rehabilitation on east I-70 near Deer Trail. Please contact Nyssa Beach at 303-746-8639 for all project related questions. Bridge Repairs on east I-70 in Arapahoe County, near Deer Trail. Work includes repairs of bridge decks at four structures, including hydrodemolition, concrete shoulder repairs, approach slab repairs, polyester concrete overlay, and substructure repairs. CODOT: 002 - Region 1- I-70 Bridge Repair and Deck Rehabilitation *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All work associated with Structures F-20-BL and F-20-BJ shall be complete except: o Polyester concrete overlay o Final pavement markings All work associated with Structures F-20-BB and F-20-BA shall be complete except: o Asphalt milling o Class 1, 2, and 3 deck repairs o Joint replacements o Substructure repairs o Compression seals o Polyester concrete overlay o Approach slab repairs o Final pavement markings The Contractor shall restore I-70 traffic to its full original lane widths of 4-foot inside shoulder, two 12-foot lanes, and an outside 10-foot shoulder. The roadway shall have full compliance signing and epoxy striping. All traffic lanes and shoulders shall be open and free from traffic control devices, and free from all obstructions for snow removal. Bridge Repairs on east I-70 in Arapahoe County, near Deer Trail. Work includes repairs of bridge decks at four structures, including hydrodemolition, concrete shoulder repairs, approach slab repairs, polyester concrete overlay, and substructure repairs.

Award

Bridges / Tunnels

$7,235,023.00

Public - State/Provincial

Paving, Site Work

140

8

8

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
0
Bidding Soon
825
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.