Published August 21, 2025 at 8:00 PM

Updated August 22, 2025

Site work for a water / sewer project in Wartrace, Tennessee. Completed plans call for site work for a water / sewer project.

CDBG Sanitary Sewer System Improvements. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. The owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit his bid security in the amount, form and subject to the conditions provided in the Information for Bidders. Doc Notes: The Information for Bidders, Form of Bid, Form of Contract, Plans, Specifications and Forms of Bid Bond, Performance and Payment Bond, and other contract documents may be examined at the following: Hussey Gay Bell - Nashville, LLC; 4117 Hillsboro Pike, Suite 206; Nashville, Tennessee 37215. Wartrace received a planning grant to study an area of its wastewater collection system that isto be improved by this project. The lines are to be cleaned, and rootsin the line cut and removed. The lines will then receive cured-in-place repair and the manholessealed with epoxy coating. The purpose of this project isto reduce the Town of Wartrace's high annual I/I percentage of 86.4%. This project would improve approximately 35% of the collection system in town that has not been rehabilitated since its original installation in the 1950s - 1960s. In order to reduce the amount of overflowsin the sewer collection lines and at the wastewater treatment plant, inflow and infiltration must be reduced. During and immediately after rainfall events, the gravity collection system is inundated by excessive inflow and infiltration. The utilitysuperintendent believesthat leaksin the collection lines have developed near or in the stream crossings which allow large volumes ofsurface water to enter the collection system. To reduce the inflow and infiltration, the Town of Wartrace is proposing to rehabilitate the sewer collection system in accordance with Section 17 of the Tennessee Division of Water Pollution Control's Design Criteria. Bidder hereby agrees to commence work under this contract on or before a date to be specified in written "Notice to Proceed" of the Owner and to fully complete the project within 275 consecutive calendar day thereafter as stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $ 200.00 for each consecutive calendar daythereafter as hereinafter provided in Paragraph 19 of the General Conditions.

Award

Water / Sewer

$183,090.00

Public - City

Site Work

4

15

4

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
79
Bidding Soon
1,495
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2025

August 28, 2025

Project location map

Multiple Locations, Wartrace, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.