Published August 14, 2025 at 8:00 PM
Updated August 15, 2025
Site work for a transportation facility in McAlester, Oklahoma. Completed plans call for site work for a transportation facility.
W519TC25RA011 Solicitation Narrative: 1. The United States Army Contracting Command - Rock Island (ACC-RI) requests a proposal on behalf of McAlester Army Ammunition Plant for a design build construction project with work consisting of furnishing labor, equipment, and materials for construction of an overhead monorail conveyor system at building 190 at McAlester Army Ammunition Plant. All work is to be done in accordance with the Scope of Work (SOW) dated 06/04/2025 attached. 2. All Offerors MUST be registered in the System for Award Management (SAM) database in accordance with Federal Acquisition Regulations (FAR) 52.204-7 and Defense Federal Acquisition Regulation Supplement (DFARS) 252.204-7004. Lack of registration in SAM will make an Offeror ineligible for award. All offerors shall be registered as ACTIVE in SAM at time of proposal submission, and remain ACTIVE until contract completion. The SAM website can be accessed at https://www.sam.gov. 3. The Government projects award a single Firm Fixed Price (FFP) type contract from this solicitation to the responsive, responsible Offeror with lowest price. This solicitation is set aside 100% for small business under NAICS 333922. 4. The Government reserves the right to reject any or all proposals and make no award if such action is in the best interest of the Government. The due date for proposal is listed in BLOCK 8. Submit proposal signed and dated to the email address in BLOCK 9. 5. The completion date for this project is projected March 30, 2029. 6. Notice to potential Offerors: In order to align with current requirements of Department of Defense Federal Acquisition Regulation Supplemental (DFARS) 201.304 and Army Federal Acquisition Regulation Supplemental (AFARS) 5101.304 there has been a change to the format of ACC-RI solicitations (and resultant contracts). This notice is to inform you of that format change and to advise you to review the entire solicitation thoroughly. 7. The Government anticipates price competition; therefore, certified cost or pricing data is not required to be submitted with the Offerors proposal. However, the Government reserves the right to request certified cost or pricing data in the event price competition does not exist. 8. A site visit may be held after award after contractor preliminary design and material list deliverable is deemed technically acceptable by MCAAP Engineering Staff. The government reserves the right to not conduct discussions. 9. DETAILED DESCRIPTION REQUIRED FOR PROPOSAL: The MCAAP Operations Management, Planning Division, Engineering Branch will validate and verify/approve the contractor's listed equipment concept proposal before award is granted. In order to meet this review requirement, the offeror shall submit as part of the proposal a detailed technical description of each item. The offeror's description submittal shall account for each one of the required product features located in the SOW. The description shall also clearly portray/describe how each item will function. Conceptual drawings that are not labeled "as built" drawings are required for submittal with the detailed description. Drawing must provide overall height, width, and length dimensions. It should depict the locations of key components. If there is a picture of the equipment or portions of the equipment, such as from a brochure, then that picture(s) should be included with the data. It is advantageous for the contractor to supply as much data as possible as the government will use this to determine technical acceptability of the proposed equipment, as related to the SOW, for production and/or purchase. Proposals shall consist of the completed RFP / Solicitation, including pricing response and FAR clauses appropriately filled-in, required certification, and required references. 10. PLEASE PROVIDE DESCRIPTION and PRICING FOR MINIMUM FOLLOWING CRITERIA related to drawing number 5166 and Sub-Line Item Numbers (SLINS). The due date for proposal submission is listed in BLOCK 8. Submit electronically signed and dated proposal to the email address specified in BLOCK 9: a. Base Monorail System b. Hanger Holding Rails c. Spur Rail (located after paint) d. Tar melt out lane e. Bomb removal station f. Hold for paint loop e. Transition Option 11. Offerors shall electronically submit questions regarding this RFP to the Contract Specialist and Contracting Officer listed in BLOCK 9 NLT: Time: 10:00 AM Central Time Date: The Government is not obligated to provide answers to all questions submitted by Contractor but will consider the questions and incorporate changes into the RFP as the Government deems necessary in its sole discretion. Questions/comments shall not be marked with a restrictive legend and shall not include proprietary information. The Government is not obligated to provide responses to questions or requests for extension submitted after the cut-off date. ACC-RI POCs for questions or clarifications of this solicitation: Contract Specialist - Adam Burgmeier adam.c.burgmeier.civ@army.mil Contracting Officer - Ryan Buhman ryan.j.buhman.civ@army.mil Gneral Project Scope: 1.1. Scope: This purchase description establishes design criteria, performance, and acceptance criteria for the overhead monorail system for inert preparation of bomb bodies. 1.2. Classification: The equipment and services supplied under this purchase description shall be performed by a contractor regularly engaged in the design and integration of material handling equipment and conveyance systems. The contractor shall have a minimum of five (5) years of experience providing such equipment and services to industry other than for its own use. Unless otherwise specified in the contract, or purchase order, the contractor will be required to provide a product that meets all drawing details and requirements. Offerors shall electronically submit questions regarding this RFP to the Contract Specialist and Contracting Officer listed in BLOCK 9 NLT: Time: 10:00 AM Central Time Date: 11 Aug 2025 The completion date for this project is projected March 30, 2029. Magnitude Between $1,000,000 and $5,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Transportation Terminals
$5,000,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 13, 2025
April 13, 2026
1 C Tree Rd, McAlester, OK
Related To This Project
McAlester, OK
Bid Date: Jul 21 2025
McAlester, OK
Bid Date: Aug 19 2025
McAlester, OK
Bid Date: Aug 28 2025
McAlester, OK
Bid Date: Sep 18 2025
McAlester, OK
Bid Date: Sep 30 2025
McAlester, OK
Bid Date: Oct 20 2025
McAlester, OK
Bid Date: Jul 10 2025
McAlester, OK
Bid Date: May 29 2025
McAlester, OK
Bid Date: May 15 2025
McAlester, OK
--
McAlester, OK
Bid Date: Apr 08 2025
McAlester, OK
Bid Date: Apr 03 2025
McAlester, OK
Bid Date: Mar 20 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.