BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 3, 2025 at 8:00 PM

Updated September 4, 2025

Site work and paving for a mixed-use development in Chicago, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

PBC Contract C1627, Chicago Department of Transportation ("CDOT") Capital Program - Alleys (Various Locations) - Package 6. The Chicago Department of Transportation ("CDOT") Capital Program - Alleys (Various Locations) - Package 6 Projects are located at: W. Armitage Ave.: W. Armitage Avenue./ W. Cortland Street/ N. Albany Avenue/ N. Whipple Street - Project 22921 - Ward 26 W. 16th St.: W.16th Street/ W. Ogden Avenue/ S. Central Park Avenue/ S. Drake Avenue - Project 22922 - Ward 24 N. Wilmot Ave.: N. Wilmot Avenue/ N. Milwaukee Avenue/ N. Oakley Avenue/ N. Leavitt Street - Project 22923 - Ward 32 W. 23rd St.: W.23rd Street/ W. 23rd Place/ S. Oakley Avenue/ S. Leavitt Street - Project 22924- Ward 25 W. Argyle St.: W Argyle Street/ W. Ainslie Street/ N. Hoyne Avenue/ N. Seeley Avenue - Project 22925 - Ward 40 W. Greenleaf Ave.: W. Greenleaf Avenue/ W. Lunt Avenue/ N. Glenwood Avenue/ N. Sheridan Road - Project 22926 - Ward 49 The Project includes reconstruction of alley sewers, subgrade and pavement utilizing recycled construction materials and methods implemented by the City of Chicago, full depth alley pavement reconstruction of City of Chicago alleys. In addition, the Work includes proper handling and disposal of onsite material, portland cement concrete base course, hot-mix asphalt, surface course, sewer and drainage structures, sewer cleaning and televising, vortex restrictors, concrete curb and gutter, concrete sidewalks and ADA Ramps various depths, concrete driveways, concrete garage aprons, concrete alleys, pre-molded rubber Speed Bumps, geotechnical fabric, topsoil, and hydraulic seeding. Contractor will be required to prepare a Phasing and Logistics Plan within 30 days of Notice to Proceed ("NTP") for review and approval by CDOT and PBC, prior to the mobilization and commencement of any Work. Contractor shall provide critical submittals, including sewer and drainage structures, within 30 days of issuance of the NTP. On-site construction work at each alley location must be completed within 45 calendar days from commencement. QUESTIONS: All questions regarding this contract must be submitted in writing, via email to Dee Taylor, Contract Officer at: dee.taylor@cityofchicago.org no later than July 31, 2025. PN - 22921 22922 22923 22924 22925 22926 Construction Budget for Base Work Only: $4,700,000.00 to $4,800,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Roads / Highways

$5,101,265.00

Public - City

Paving, Site Work

224

12

8

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
465
Active Projects
274
Bidding Soon
3,330
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

September 15, 2025

Project location map

Multiple Locations, Chicago, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.