BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2025 at 8:00 PM

Updated September 13, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Pemiscot Township, Missouri. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

A. The basis of bids is a general description of the work and materials which shall be included in the bid items listed on the bid proposal. Bid item prices shall generally reflect the scope of work described below. It shall be understood by the bidder that the total bid price listed on the bid proposal shall represent total compensation for the entire project based on the estimated quantities given. Due to the complex nature of this project, some overlap of work items is inevitable and some minor items may not be included below. It is the contractor's responsibility to be sure that all work items are included in his/her bid prices. B. Payment after the award of the contract will be based on the number of units completed for unit price items or on the percentage of each lump sum item for the work that has been completed or as outlined I the specifications. Payment will not be made for items that have not been complete. Question Deadline 08/01/2025 Questions received less than ten days prior to the date for opening of Bids may not be answered. Replace a deficient bridge with new three-span concrete box beam bridge The DBE (Disadvantaged Business Enterprise) contract goals for the amount of work to be awarded for the Pemiscot County Road 472 Bridge Replacement, is 3% of the total project price. The Owner must award the project to the lowest responsive, responsible bidder, however the owner may reject all bids. All bidders are required to use the pre-qualification process outlined by MoDOT. See the Missouri Standard Specifications for Highway Construction, Section 102 for additional information. Each Bidder must deposit with his bid, security in the amount, form, and subject to the conditions provided in the Information for Bidders. No Bidder may withdraw his bid within 60 days after the actual date of the bid opening Direct questions to Colter Gaebler with S.H. Smith & Co., Inc MODOT - Pemiscot County Road 472 Bridge Replacement Project

Post-Bid

Bridges / Tunnels

$4,000,000.00

Public - County

Demolition, New Construction, Paving, Site Work

21

12

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
32
Bidding Soon
685
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2025

October 13, 2025

Project location map

Co Rd 472, Pemiscot Township, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.