BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2025 at 7:00 PM

Updated December 10, 2025

Site work, paving and outdoor lighting for a mixed-use development in Houston, Texas. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of 9/9/2025, this project has been cancelled, but the City may republish this solicitation. The project includes construction of concrete paving, storm drainage systems, curbs, sidewalks, driveways, street lighting, and all necessary underground utilities. Question Deadline 11/14/2025 at 4:00 PM CT Requests for additional information and questions shall be addressed to the Finance Department, Strategic Procurement Division, Merica Arceneaux-Carter, preferably by e-mail to Merica.ArceneauxCarter@houstontx.gov or by telephone at (832) 393-8765 Work of the Contract is for the construction of pavement, storm sewer and waterline improvements in the Roseland Subdivision. The streets included in the project are as follows: 1. Oakley Street from Montrose Boulevard to Spur 527 2. Woodrow Street from Montrose Boulevard to Spur 527 3. Kyle Street from US-59 to Richmond Avenue 4. Roseland Street from US-59 to Richmond Avenue 5. Stanford Street from US-59 to Richmond Avenue 6. Greeley Street from Spur 527 to Richmond Avenue 7. Jack Street from Spur 527 to Richmond Avenue Pavement reconstruction work shall include the removal and replacement of pavement and curbs, construction of driveways, sidewalks, wheelchair ramps, utilities, and traffic control devices. This project shall include all items identified in Document 00410 including, but not limited to, pavement removal and replacement, construction of storm sewers, cleaning of existing Monolithic Reinforced Concrete, MRC, storm sewers and post cleaning CCTV inspection of MRC storm sewers, storm sewer inlets and leads, waterlines, sanitary sewers and sanitary sewer service lines, trench protection, dewatering, bypass pumping, traffic control, signage and striping, street light conduit, tree protection, stormwater pollution prevention measures, and site restoration. Construction methods for utilities include open cut and trenchless methods. Adjustment to grade of existing manhole frames and covers, inlets, valve boxes, and meters to remain to match construction. Adjustments shall be incidental to related pay items.

Bid Results

Roads / Highways

$403,500.00

Public - City

Outdoor Lighting, Paving, Site Work

123

27

4

3

Subscribe For Documents

117 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
368
Active Projects
103
Bidding Soon
3,769
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2025

January 1, 2026

Project location map

Multiple Locations, Houston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.