BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 6, 2025 at 8:00 PM

Updated August 7, 2025

Site work for a road / highway in Millertown, Newfoundland. Completed plans call for site work for a road / highway.

Closing Time: 12:00 PM (NT) Question Acceptance Deadline 2025/07/23 12:00:00 PM NDT Harpoon Bridge, Millertown Area, existing 90' steel structure to be removed/de-launched, existing decking and running surface to be cut into 10' sections upon removal, salvaged, and transported back to the Millertown office. This will not be considered an additional cost and is to be included in the bid price for the bridge removal. Old wooden abutments to be removed and properly disposed of outside the 30m No Grub Zone. New bin wall abutments to be assembled, installed, and back filled as per manufacturer's spec. All bin wall components are located at the Forestry Depot in Pynn's Brook. All components will need to be picked up at the Depot and delivered to site by the successful contractor. This is not considered an additional cost and is to be included in the bid price for the bridge installation. 10' of bridge to be removed from existing 90ft structure & additional 40' of steel panel bridge to be assembled and installed (20' on each end) comprised of high sheer panels as per manufacturer's spec. The components for the additional 40' of bridge will need to be picked up at the Forestry Depot in Pynn's Brook and transported to site. This will not be considered an additional cost and is to be included in the bid price for the bridge installation If launch nose is used, it must to be assembled as per manufacturer's spec and drawings and used to launch 120' steel panel bridge in place. All launch nose components and rollers used for the launch are located at the Forestry Depot in Pynn's Brook. This will need to be picked up by the Contractor and transported to site. This will not be considered an additional cost and is to be included in the bid price for the bridge installation. If the Contractor decides to de-launch/launch the bridge with a crane, it is the Contractor's responsibility to contact the bridge manufacturer and develop a crane assisted de-launch/launch plan. This will be at the Contractor's expense and will not be considered an additional cost to the contract Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Roads / Highways

$237,893.00

Public - State/Provincial

Site Work

24

9

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
3
Bidding Soon
71
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2025

August 11, 2025

Project location map

To Be Determined, Millertown, NL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.