Published August 29, 2025 at 8:00 PM

Updated August 30, 2025

Site work for a civil project in Ayer, Massachusetts. Conceptual plans call for site work for a water / sewer project.

**As of August 29th, 2025, the project is cancelled. Project is no longer needed.** The Ayer Department of Public Works (DPW), the Awarding Authority, invites sealed bids from qualified contractors for the rehabilitation of the two (2) Tertiary Filter Tanks in the Ayer Wastewater Treatment Plant for the Ayer DPW in Ayer, Massachusetts, in accordance with the documents prepared by the Ayer DPW. The project is located at the Wastewater Treatment Plant, 25 Brook Street in Ayer. All work shall be substantially complete within 90 consecutive calendar days of the date fixed in the Notice to Proceed and fully completed within 120 consecutive calendar days of the date fixed in the Notice to Proceed. Questions concerning this IFB or to schedule a site visit please contact Kimberly Abraham at kabraham@ ayer.ma.us or 978-772-8240. The Owner reserves the right to waive any informality in or to reject any or all Bids if deemed to be in its best interest. The successful bidder shall provide a list of labor and materials needed to complete the following work in the Ayer Wastewater Treatment Plant. Rehabilitate the two (2) Tertiary Filter Tanks. Power wash the tanks to remove soluble contaminants which are detrimental to the adhesion of the new coating system. Apply two (2) coats of appropriate coating to protect the tanks from further corrosion. The WWTP must remain in operation through out the process, so only one (1) tank can be worked on at a time. MBE or WBE has at least a twenty-five percent (25%) The work involves rehabilitation of the two (2) existing tertiary filter tanks at the Town of Ayer Wastewater Treatment Plant. The Wastewater Treatment Plant must remain operational throughout the process so only one tank can be worked on at one time. The interior existing equipment will be removed prior to work starting by the Owner. The Contractor will prepare the tanks for new coatings. Power wash the tanks to remove soluble contaminants which are detrimental to the adhesion of the new coating system. Achieve near white blast for recommended cleanliness profile. Apply two (2) coats of Dura-plate UHS @ 12 MILS dft or equivalent. Patching and welding is not part of this scope. If patching or welding is needed, a change order will be required. See Appendix A for Tertiary Filter Tank drawings.

Project Abandoned

Water / Sewer

$172,860.00

Public - City

Site Work

3

9

4

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
620
Active Projects
241
Bidding Soon
4,585
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2025

February 27, 2026

Project location map

25 Brook St, Ayer, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.