Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 26, 2025 at 8:00 PM
Updated August 27, 2025
Renovation of a mixed-use development in De Soto, Kansas. Completed plans call for the renovation of a educational facility.
The contractor shall at all times keep the premises free from accumulation of waste materials or rubbish used by their operation. Upon completion of the work, the contractor shall remove all of the waste materials and rubbish from and about the project site as well as any equipment, tools, surplus materials, etc. The contractor shall furnish, install, and maintain adequate barricades, signs of warning, and all other protective devices and equipment required, to protect or secure the area, students, and all other person. The contractor will be responsible for making the opening secure at the end of each day. The De Soto Board of Education will consider awarding a contract for this project to the lowest responsible bidder . The project schedules shall be: Entire project to begin October 6, 2025 and completed by November 17, 2025. The contractor shall furnish the following bonds: Bid Bond with bid in the amount of 5% of the total bid. A Performance Bond, and file a Kansas Statutory Payment Bond in the amount of 100% of the contract sum with the district court in Johnson County Kansas will be due when contract is awarded to contractor. A one-year maintenance bond for total sum of project The contractor will furnish a Certificate of Insurance for both general liability in the amount of $1,000,000.00 Bodily Injury and Death with a $2,000,000 aggregate and $1,000,000.00 Property Damage with a $1,000,000.00 aggregate, and in addition the state required workman-compensationbefore starting the project. The De Soto Board of Education reserves the right to reject any and all bids submitted, and waves any formalities deemed to be in the best interest of the school district. Contractors having not done previous work for the District will be required to submit a Contractor's Qualification Statement. The point of contact during the bid process will be: Alec Mackay, HTK Architects Office Phone: 913.663.5373 E-mail: adm@htkarchitects.com Each Bidder shall examine the bidding documents carefully and, not later than ten (10) days prior to the date for receipt of bids, shall make written request to the Architect for interpretation or correction of any ambiguity, inconsistency or error therein which he may discover. Any interpretation or correction will be issued as an Addendum by the Architect. ONLY A WRITTEN INTERPRETATION OR CORRECTION BY ADDENDUM SHALL BE BINDING. Question Deadline 07/18/2025
Award
Educational
$371,742.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 30, 2025
October 6, 2025
8355 Peoria St, De Soto, KS
Related To This Project
De Soto, KS
Bid Date: Aug 21 2025
De Soto, KS
Bid Date: Aug 21 2025
De Soto, KS
Bid Date: Aug 27 2025
De Soto, KS
Bid Date: Sep 04 2025
De Soto, KS
--
De Soto, KS
Bid Date: Dec 17 2025
De Soto, KS
--
De Soto, KS
--
De Soto, KS
--
De Soto, KS
--
De Soto, KS
Bid Date: Mar 19 2025
De Soto, KS
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
