Site work and paving for a road / highway in Alvo, Nebraska. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work is generally described as follows: remove existing asphalt; mill 3 to a uniform height; spot repair sub grade preparation; remove three (3) existing speed humps; placement and compaction of 4 HMA Type SLX on roadway and speed bump improvements; apply tack to milled roadway surface prior to placement of HMA. Returns at all intersections, drives, and alleys shall be tapered to the existing surface. The resurfaced area measures approximately 2,130 feet long by 24 feet wide. All asphalt work shall conform to Asphalt Institute specifications. Application of new HMA overlay shall be on 1st Street beginning at the intersection of Russell Street/HWY 63 and ending at Boyles Street. Proposals will be taken for said construction work listed above by unit prices, as an aggregate bid for the entire project. All proposals for said construction work must be accompanied by Bid Security of not less than 5% of the amount bid. Bid Security to be made payable to the Village of Alvo as liquidated damages in case the bid is accepted and the bidder neglects or refuses, to enter into contract and furnish bond in accordance herewith. The Owner reserves the right to waive informalities and irregularities and to make awards on bids which furnish the materials and construction that will, in their opinion serve the best interests of the Owner, and also reserves the right to reject any and/or all bids. The Village of Alvo, Cass County, Nebraska (Village), is soliciting bids for construction of an asphalt overlay on a segment of locally owned/maintained street. This project is being supported by the U.S. Department of Housing and Urban Development, Community Development Block Grant funding. As such, certain requirements and other federal provisions apply to this opportunity. Existing speed humps located approximately at the following locations along Fletcher Avenue/1st Street: 150 feet east of the intersection with Main Street 115 feet west of the intersection with Paul Street 35 feet west of the intersection with Boyles Street Following removal of existing speed humps, the selected contractor shall furnish and construct a new series of asphalt speed humps to maintain reduced vehicle speeds of 25 mph. Each speed hump shall: Be constructed of hot mix asphalt (HMA) Be 4 inches in height Be 13 inches in width Extend across the entire width of the roadway Written questions related to the bid opportunity will be accepted by the Village until July 31, 2025. Questions should be directed to the Village Clerk/Treasurer at villageofalvo@outlook.com. Please note that Village office hours are every other Tuesday (July 8, July 22, etc.) from 5:00 p.m. to 7:00 p.m. Responses to written questions will be posted on the Village's website, www.alvo.gov, on July 31, 2025.

Award

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
86
Bidding Soon
894
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2025

September 4, 2025

Project location map

Alvo Rd, Alvo, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.