BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 27, 2025 at 8:00 PM

Updated August 28, 2025

Site work and paving for a mixed-use development in Folsom, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; and water / sewer project.

In partnership with Toll Brothers, Inc., the City of Folsom is hereby providing supplemental notification of a public bid, managed by Toll Brothers, for the Pedestrian Trail Improvements Phases 2, 4, and 5 Project. This project is located in the City of Folsom in the Folsom Plan Area and the work is described as follows: "Work consists of trail improvements broken down into Phases 2, 4 and 5; work will include traffic control, clearing and grubbing, import, trail subgrade preparation, swale refurbishment, embankment import material and construction, masonry retaining walls, rock lined swale, asphalt concrete, aggregate base, pavement markings, striping, post and cable barrier, open metal fencing, sidewalk barrier, inlet control structure, overside drainage swale, storm drain, etc. License Required: A or combination of Class C that make up majority of the work. Question Deadline 07/31/2025 All questions and requests for clarifications need to follow the bid documents through the appropriate points of contact, Mr. Martin Nivinski, mnivinski@tollbrothers.com. THE WORK: TOLL WEST INC. WHICH WILL DO BUSINESS IN CALIFORNIA AS TOLL BROTHERS WEST INC. (hereinafter "Owner") hereby invites sealed bids to furnish all materials, equipment, labor and supervision, etc. required to complete all work for the Pedestrian Trail Improvements project in the City of Folsom, California. The Pedestrian Trail Improvements generally include fine grading, erosion control, paving, striping, post & cable fencing, and open metal fencing. The trails are divided into multiple phases of work, Phases 2, 4 & 5 are being bid now. The bid shall be prepared in accordance with the following documents/exhibits: Phase 2: Improvement Plans for Toll Brothers at Folsom Ranch - Phase 2 Trail. Approval date: 6/24/25. Phase 4: Improvement Plans for Toll Brothers at Folsom Ranch - Phase 4 Trail. Approval date: 6/24/25. Phase 5: Improvement Plans for Toll Brothers at Folsom Ranch - Phase 5 Trail. Approval date: 6/24/25. Most current City of Folsom Construction Specifications, Forms and Standard Details, available for download on the City of Folsom website: https://www.folsom.ca.us/government/community-development/development-engineeringservices/improvement-standards-construction-specifications-and-details Folsom Municipal Code and Ordinances These Instructions to Bidders Bid Forms Special Provisions Trail Location Plan Exhibit Sample Contract Geotechnical Engineering Study: Youngdahl 5/15/19; Updated 12/18/20. Central Valley Regional Water Quality Control Board 401 Permit (WDID#5A34CR00581) USACE 404 Permit (SPK-2007-02159) USACE 404 Permit (SPK-2013-00486) DFW Final Lake and Streambed Alteration Agreement (1600-2012-0198-R2) DFW Information in Response to Notification of Incomplete Lake or Streambed Alteration Notification No 1600-2012-0198-0002-R2)

Award

Sidewalks / Parking Lot

$2,574,071.00

Public - City

Paving, Site Work

23

5

3

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
377
Active Projects
113
Bidding Soon
2,413
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.