BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 17, 2025 at 7:00 PM

Updated December 18, 2025

Site work and paving for a road / highway in Fe Warren Afb, Wyoming. Completed plans call for site work for a road / highway; and for paving for a road / highway.

PROJECT NUMBER: CO OMAD 300(70) PROJECT NAME: Minuteman Missile Access Road Question Deadline 11/18/2025 at 4:00 PM MT Questions can be submitted to CFLContracts@dot.gov PROJECT DESCRIPTION: CO OMAD 300(70) - The Office of Missile Air Defense Program (OMAD) is a Defense Access Road (DAR) program used by the Department of Defense (DoD) to fund the annual maintenance and improvements on certified gravel roads. FHWA works with the Military Surface Deployment and Distribution Command (SDDC) to support the Air Force Intercontinental Ballistic Missile Program (Minuteman). These Minuteman Missile Access Roads are located in southwestern Wyoming, southeastern Nebraska, and northeastern Colorado. In cooperation with the F.E. Warren Air Force Base and Central Federal Lands Highway Division, this project includes re-graveling of up to 156.582 miles of existing gravel Minuteman Missile Access Roads in various counties within Colorado, Nebraska, and Wyoming. The intent of this project is to provide necessary aggregate road maintenance for select routes utilized by the United States Air Force. With a fixed-price variable-scope contracting method, less mileage may be awarded. The total amount of miles included in the scope will be dictated by the mileage proposed. The project PS&E will provide a prioritized schedule of roadways to be improved that is anticipated to include up to 156.582 total miles of roadway reconditioning and re-graveling of existing aggregate surface roads. SCOPE OF THE WORK: The work includes roadway reconditioning and adding four inches of aggregate surface course. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations. Questions must be submitted in writing by e-mail at CFLContracts@dot.gov

Bid Results

Roads / Highways

$5,979,541.00

Public - Federal

Paving, Site Work

80

8

2

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
39
Bidding Soon
479
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2025

February 16, 2026

Project location map

To Be Determined, Fe Warren Afb, WY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.