Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 21, 2025 at 8:00 PM
Updated August 29, 2025
Renovation of a theater / auditorium in Hertford, North Carolina. Completed plans call for the renovation of a theater / auditorium.
*The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder. *This project is being bid by invitation only. If you have been contacted by the owner to bid on this project as a general contractor, and would like to be listed below, please notify our editorial staff at contentcase@constructconnect.com. Extent of demolition is shown on the Drawings. Refer to all Drawings and project phasing requirements. Demolition may require the removal and subsequent off-site disposal of the following, but is not limited to: Removal of asphalt or concrete paving, with curb and guttering. Removal of building structures and structural elements, complete with foundations - including concrete floors/walks and exterior canopies. Removal of building exterior wall and roof components. Removal of interior walls and components. Removal of partitions, doors and door frames. Removal of windows and window walls. Removal of ceiling systems, floor finishes and wall finishes. Removal of existing auditorium seating. Removal of underground elements and components; piping and accessories. Removal of plumbing, electrical and mechanical equipment. Cutting concrete floors, masonry walls and ceilings for piping, ducts, and conduit is included with the work of the respective mechanical and electrical Divisions 15 and 16 Specification Sections. Locating and identification of existing underground utilities. Extend of site clearing is shown on drawings. Site clearing work includes, but is not limited to: o Removal of trees and other vegetation. o Topsoil stripping and stockpiling. o Clearing and grubbing. Extent of earthwork is indicated on drawings. Earthwork includes all excavation (removal of material) necessary to reach subgrade elevations indicated. This includes subsequent disposal of material. Preparation of subgrade for building pads, parking areas, access roads and storm drainage installation are included as part of this work. Refer to Geotechnical Report recommendations for fill. On site excavated soils may be used in nonstructural areas. Off-site select material must be used for fill and trench backfill at structural areas (buildings, drives, and walkways). Off-site select material used for fill from subgrade (natural grade less stripped organics) to reach design elevations is to be included in bid and is not to be charged against the off-site fill allowance under Section 01056. Off-site select material used for trench backfill is to be included in bid and is not to be charged against the off-site fill allowance under Section 01056. Extent of portland cement concrete paving includes concrete sidewalks, curbs and gutters, as shown on Drawings. Work of this Section shall consist of all labor and materials required to provide all miscellaneous fabricated metal items scheduled on Drawings and specified in this Section. Miscellaneous metal items for which drawing information is fully descriptive that are not necessarily named herein, shall be provided as shown and as required, providing complete assemblies. Work of this Section shall consist of all labor and materials required to provide all rough carpentry work scheduled on Drawings and specified herein. Contract work of this Section shall include, but not be limited to providing following: All sheet metal work required for complete assemblies of items specified at all areas indicated on Drawings, including but not necessarily required: Cornice Wraps / Fascia Claddings Gutters Downspouts Copings All sheet metal work required for moisture control Metal valley flashing Metal base flashings and counter flashings Ventilation perforated sheetmetal Work of this Section shall require furnishing all labor and materials to provide sealants, non-rated caulking, fire-rated fire caulking, and related primers, including expansion joint fillers, interior and exterior, as shown on Drawings and as specified in this Section. Caulking and primers required for installation of all work included in Sections for Window Wall, Storefront Systems shall be part of work under that Section and shall be done in accordance with the applicable portions of this Section. Acoustical caulking for installation of gypsum board is specified in Section 09250. Required applications of sealants and caulking include, but are not necessarily limited to, following general locations: Flashing reglets and retainers. Coping Members, Bed and Joints. Interior and exterior wall joints around doors and windows perimeters. Exterior wall control joints Horizontal and vertical interior CMU wall and structural steel joints Joints at penetrations of walls, decks and floors by piping and other services and equipment. Fire-rated penetrations of walls, decks and floors by piping and other services and equipment. Concrete walk and pavement expansion joints Exposed interior concrete floor slab control joints Required applications of joint fillers and gaskets include, but are not necessarily limited to, the following general types of work and locations: Expansion joint fillers in structural concrete. Exterior wall expansion joint fillers. Fire-rated pipe and conduit through penetrations. Work required under this Section consists of providing galvanized hollow metal doors, frames, transoms, mullions, view window frames, and related items necessary to complete work indicated on Drawings and described in these specifications. Provide galvanized steel doors and frames for all openings where reasonably inferable from plan drawings, whether specifically scheduled and detailed or not. Work of this Section shall include furnishing, delivering, and storing where directed at site, the following: Solid Core Wood Doors, as shown on drawings and specified herein. Intent of drawings and specifications is to provide all wood doors for the entire project as indicated on plans, whether specifically scheduled or not. Provide wood doors for all openings where reasonably inferable from plan drawings. Work of this Section shall include all labor, materials, equipment, transportation, tools and storage required for complete installation of all finish hardware shown and scheduled on Drawings and specified herein. Intent of this Specification is to provide complete finishing hardware requirements for entire building project excepting hardware, which is specifically mentioned hereinafter as being furnished by others. Any openings not specifically mentioned herein shall be furnished consistent with hardware specified for similar openings. Wood doors for Project are prefit. Coordinate with wood door manufacturer in furnishing hardware templates and schedules at earliest possible time. Under this Section, provide gypsum board for wall assemblies (non-fire rated and fire-rated), partitions, ceilings, ceiling access doors, fireproofing for beams and columns as indicated on drawings and as specified herein. Note all gypsum drywall, except as noted on drawings, shall be provided with a LEVEL 4" gypsum wallboard finish. Work under this section includes providing drywall metal stud partition system, metal framed drywall ceiling furring system, metal stud wall furring system, and drywall ceiling suspension system, for installation of gypsum board. Provide acoustical ceiling systems, complete as shown and as specified herein, including exposed tee suspension systems and acoustical lay-in boards. Coordinate work with installation of air conditioning grilles and diffusers specified in Division 15B and with installation of lighting fixtures specified in Division 16. Furnishing and installing all carpet scheduled on Drawings and specified in this Section. All carpet specified shall be manufactured with a static control system which reduces static generation below generally accepted sensitivity threshold of 3.0 kilovolts tested 20% relative humidity at 70 degree F. by "Shuffle" test. Extent of painting work is shown on drawings and schedules, and as herein specified. The work includes painting and finishing of all interior and exterior exposed items and surfaces throughout project, except as otherwise indicated. Surface preparation, priming and coats of paint specified are in addition to shop-priming and surface treatment specified under other sections of work. "PAINT" as used herein means all coating systems materials, including primers, emulsions, enamels, stains, sealers and fillers, and other applied materials whether used as prime, intermediate or finish coats. Paint all exposed surfaces, unless otherwise noted, whether or not colors are designated in "schedules", except where natural finish of material is specifically noted as a surface not to be painted. Where items or surfaces are not specifically mentioned, paint same as adjacent similar materials or areas. If color or finish is not designated, Architect will select these from standard light colors available for materials systems specified. Where indicated, "accent" colors are medium to deep shades, which shall require no more than one additional paint coat. Following categories of work are not included as part of field-applied finish work, or are included in other sections of these specifications. Shop Priming: Unless otherwise specified, shop priming of ferrous metal items is included under various sections for structural steel, miscellaneous metal, hollow metal work, and similar items. Also, for fabricated components such as architectural woodwork, wood casework, and shop-fabricated or factorybuilt mechanical and electrical equipment or accessories. Pre-Finished Items: Unless otherwise indicated, do not include painting when factory-finishing or installer finishing is specified for such items as (but not limited to) metal toilet enclosures, prefinished partition systems, acoustic materials, architectural woodwork and casework, finished mechanical and electrical equipment including light fixture, switchgear and distribution cabinets, elevator entrance frames, doors and equipment. Do not paint over any code-required labels, such as Underwriters' Laboratories and Factory Mutual, or any equipment identification, performance rating, name, or nomenclature plates. Work of this Section shall include but is not limited to: provide and install all building interior sign plaques, exterior building letters, and to provide for the purchase of building equipment as determined by the Owner. Signs, and equipment indicated to be purchased and installed with the allowance specified in 01056 Allowances, to include tax and freight, but not to include labor or installation, except as specifically stated below. Signs and equipment shall be installed by the Contractor in accordance with manufacturer's recommendations. Equipment Platform egress ladder signage is not part of this allowance. Construction of masonry yard sign is not a part of this allowance. Project sign, site directional and parking signs are not part of this allowance. The scope of work consists of the furnishing and installing of complete plumbing (exterior and interior) and HVAC systems including miscellaneous systems. The Mechanical Contractor (hereafter referred to as "the Contractor", either Plumbing or HVAC) shall provide all supervision, labor, materials, equipment, machinery, and any and all other items necessary to complete the systems. The Contractor shall note that all items of equipment are specified in the singular; however, the Contractor shall provide and install the number of items of equipment as indicated on the drawings and as required for complete systems. The scope of work consists of the furnishing and installing of complete electrical systems including miscellaneous systems. The Electrical Contractor (hereafter referred to as "the Contractor", or Electrical Contractor) shall provide all supervision, labor, materials, equipment, machinery, and any and all other items necessary to complete the systems. The Contractor shall note that all items of equipment are specified in the singular; however, the Contractor shall provide and install the number of items of equipment as indicated on the drawings and as required for complete systems. It is the intention of the Specifications and Drawings to call for finished work, tested and ready for operation. Any apparatus, appliance, material, or work not shown on the drawings but mentioned in the specifications, or vice versa, or any incidental accessories necessary to make the work complete and perfect in all respects and ready for operation, even if not particularly specified, shall be furnished, delivered, and installed by the Contractor without additional expenses to the Owner. Minor details not usually shown or specified, but necessary for proper installation and operation, shall be included in the Contractor's estimate, the same as if herein specified or shown. With submission of bid, the Contractor shall give written notice to the Architect of any materials or apparatus believed inadequate or unsuitable, in violation of laws, ordinances, rules, and any necessary items or work omitted. In the absence of such written notice, it is mutually agreed that the Contractor has included the cost of all required items in his proposal, and that he will be responsible for the approved satisfactory functioning of the entire system without extra compensation.
Post-Bid
Theaters / Auditoriums
$500,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 28, 2025
September 5, 2025
305 S Edenton Rd St, Hertford, NC
Related To This Project
Hertford, NC
Bid Date: Nov 22 2021
Hertford, NC
Bid Date: Oct 19 2021
Hertford, NC
Bid Date: May 02 2019
Hertford, NC
Bid Date: Mar 14 2019
Hertford, NC
Bid Date: Nov 25 2025
Hertford, NC
Bid Date: May 07 2025
Hertford, NC
Bid Date: Jan 23 2025
Hertford, NC
--
Hertford, NC
--
Hertford, NC
--
Hertford, NC
--
Hertford, NC
Bid Date: Jul 15 2025
Hertford, NC
Bid Date: Dec 04 2024
Hertford, NC
Bid Date: Dec 04 2024
Hertford, NC
Bid Date: Mar 21 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
