BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 10, 2025 at 8:00 PM

Updated September 11, 2025

Site work for a transportation facility in Santa Cruz, California. Completed plans call for site work for a transportation facility.

This project will install two dual-port charging cabinets capable of charging up to four buses simultaneously. The associated infrastructure improvements will include the installation of a new 2500-amp PG&E metered service and distribution board, a PG&E transformer, and underground circuits to supply power to the charging cabinets. The scope of work also encompasses trenching, construction of concrete footings, site work, installation of protective bollards, and all other ancillary equipment and improvements necessary to support the charging infrastructure. Lowest responsive bidder must meet the EVITP installer requirements as specified by the EnergIIZE program. Requests for clarification or interpretation of the Bidding Documents shall be received no later than 5:00PM on Friday, August 15, 2025 and addressed only to: Michael Cabak University of California, Santa Cruz Physical Planning, Development & Operations 1156 High Street, Barn G Santa Cruz, CA 95064 mcabak@ucsc.edu The successful Bidder will be required to have the following California current and active contractor's license at the time of submission of the Bid: CSLB General Engineering (A) or General B License Requirement Construction of Campus Parking and Roads - Electric Bus Charger Installation includes all activities, materials and labor necessary to install two dual-port electric bus charger dispensers, power supply cabinets, conduits, conductors, trenching back fill, pull boxes main switchgear, distribution panel, PG&E metering cabinet and stub outs for PG&E tie in from new dedicated transformer (by PG&E). 2. The work to be done includes all labor, tools and equipment necessary to furnish and install all materials and equipment shown on the drawings and described herein and to perform tests described herein, to provide complete and operating systems to the extent specified and shown on the drawings. The Contractor shall furnish all equipment, material and supplies, except where specifically noted as existing or supplied by The University General Description of Work: Campus Parking and Roads - Electric Bus Charger Installation at the University of California Santa Cruz, includes, but is not limited to, the following: 1. Site work including demolition, erosion control, misc. grading, landscape, and drainage corrections. 2. Concrete demolition, concrete flatwork and asphalt paving. Electrical conduits, racks, cabling, pull boxes, trenches, switchgear, terminations, testing, start up and commissioning. 3. Miscellaneous metal railings, bollards, flashing, metal accessories and attachments. 4. Testing and commissioning of complete installed equipment and systems. 5. Special care shall be given to utility shutdowns of and tie-ins to existing campus utilities. Impact to the campus operations must be minimized. 6. Special care shall be taken with respect to existing grades and the preservation of existing trees. Measures consistent with such considerations will be required during construction. 7. Overall site coordination with adjacent facilities. Continued operations in adjacent facilities are required throughout all phases of construction. 8. The project shall comply with all Electric Vehicle Infrastructure Training Program (EVITP) requirements listed in AB-841. (for EVITP details, reference section 4, bill text - AB-841 Energy: Transportation Electrification: Energy Efficiency Programs: School Energy Efficiency Stimulus Program). 25% of all electricians working on this installation must hold an Electric Vehicle Infrastructure Training Program (EVITP) certification. A minimum one electrician with the EVITP certification is required. 9. The Contractor shall obtain any required certifications or installer qualifications imposed by the charger manufacturer for equipment factory startup, and hand it over to the manufacturer for continuing operations, maintenance and billing. It shall be the burden of the contractor to investigate these requirements in advance of submitting their bid. The contractor shall be responsible for all costs, actions and time impacts required as a result of obtaining this certification or qualification.

Bid Results

Transportation Terminals

$839,505.00

Public - State/Provincial

Site Work

11

8

8

10

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
4
Bidding Soon
1,211
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2025

November 3, 2025

Project location map

110 Carriage House Rd, Santa Cruz, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.