BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 8, 2025 at 8:00 PM

Updated September 9, 2025

Renovation of an educational facility in Lexington, Kentucky. Completed plans call for the renovation of a educational facility.

This project includes HVAC equipment and controls upgrades across three of KCTCSs facilities on two different campuses, which include Buildings B & S on Leestown Campus and Megowan building on Newtown Campus. The HVAC scope varies at each building with the overall objective to upgrade existing equipment and integrate existing and new HVAC control systems to KCTCSs multi-campus control system. Building B Miscellaneous existing HVAC equipment will be replaced. New fans will be provided in the large shop areas. New instructor office HVAC system will be provided. The original pneumatic control system will be removed entirely, and a new building automation system will be provided. Building S The hot water central plant upgrades will include new boilers and multiple pump replacements. A new HVAC system will be provided to serve the corridor. Ceiling and wall fans will be provided in the shop areas. A mini-split system will be provided in offices and the classroom. A bid alternate will be considered to replace the Welding Lab heating and ventilating unit and exhaust systems. The existing DDC controls infrastructure will be upgraded to current KCTCS specifications, along with integrating the new HVAC equipment into the building automation system. Megowan Building A second heating hot water boiler will be provided to the central plant for redundancy. The two hot-chilled water central air handling units will be replaced. A bid alternate will be considered to also replace the Gymnasium rooftop hot-chilled water air handling unit. New VAV boxes with hot water reheat will be provided throughout the building. The existing DDC controls infrastructure will be upgraded to current KCTCS specifications, along with integrating the new HVAC equipment into the building automation system Question Deadline 08/01/2025

Award

Educational

$2,268,700.00

Public - State/Provincial

Renovation

18

14

14

10

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
87
Bidding Soon
1,426
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2025

August 20, 2025

Project location map

168 Opportunity Way, Lexington, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.