BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2025 at 7:00 PM

Updated December 3, 2025

Site work, paving, outdoor lighting and new construction of a civil project in Goodyear, Arizona. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; water / sewer project; road / highway; for outdoor lighting for a road / highway; and road / highway.

303 MA 099 303-A-(219)T Bob Stump Memorial Parkway (303 MC 85 - Van Buren St) The proposed project is located in Maricopa County within the City of Goodyear from MC 85 to Van Buren Street between Milepost 99.14 and Milepost 103.23. The work consists of constructing new freeway from MC85 to the existing termini at Van Buren. The work includes excavation, embankment, concrete and asphaltic concrete paving, nine new concrete bridges, retaining walls, sound walls, storm drain, catch basins, reinforced concrete box culverts, concrete channels, landscaping, erosion control, pavement markings, signing, traffic signals, lighting, FMS, and other related work. Central District Item # 8899 Engineering Specialist: Mahdi Ghalib Question Deadline 12/09/2025 The Department May Not Answer All Questions, and Any Decision on Whether a Question is Answered Will Be Within the Sole Discretion of the Department. Any Questions Received Less Than Three Working Days Prior to The Bid Opening Date May Not Be Answered. The time allowed for the completion of the work included in the Construction Phase of the contract will be 1,400 calendar days. The time allowed for the completion of the work included in the Landscape Establishment Phase of the contract will be 365 calendar days. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount bid, shall be 7.77. The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. AZDOT - New Facilities (Construction of New Roads) - Multiple Locations PN - 303L MA 099 H687001C, 303L MA 099 303L MA 099 H687001C 303-A(219)T BOB STUMP MEMORIAL PARKWAY (SR 303L) (MC 85 TO VAN BUREN STREET)

GC Bidding

Bridges / Tunnels

$612,609,604.00

Public - State/Provincial

New Construction, Outdoor Lighting, Paving, Site Work

3796

9

54

4

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
41
Bidding Soon
1,170
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2025

February 10, 2026

Project location map

Multiple Locations, Goodyear, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.