BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 10, 2025 at 8:00 PM

Updated October 11, 2025

Site work for a water / sewer project in Greenwood, Indiana. Completed plans call for site work for a water / sewer project.

The Work shall include: Storm sewer rehab via CIPP lining. Approximately 1,931 linear feet of corrugated metal pipe (CMP) ranging in size from round 12-inch to 60-inch and elliptical 21x32-inch to 45x70-inch. Cure water must be disposed of to the sanitary sewer system, and may not be allowed to flow downstream via storm sewer. Work will include one (1) known point repair and the installation of one (1) manhole structure. Work will also include any surface repairs incidental to construction, temporary erosion and sediment control, and maintenance of traffic. Each Bid shall be accompanied by the Contractor's Bid Attachment (included with the Contract Specifications) to Form 96, a Financial Statement (completely filled out and signed) and a bid security in the form of an acceptable certified check payable to the Owner or an acceptable Bidder's bond, in an amount of not less than ten (10) percent of the total bid price, in accordance with the Contract Specifications. The Contractor to whom the Work is awarded will be required to furnish an acceptable Performance and Payment Bond each in the amount of 100% of the contract price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion. Copies of the Drawings and Specifications for the Work are on file (for viewing purposes only) at 367 S. Washington Street, Greenwood, IN 46143; and the Engineer's office, Wessler Engineering, 6219 South East Street, Indianapolis, Indiana 46227, Telephone (317) 788-4551. The Owner reserves the right to waive any informalities or minor defects in bids or bidding procedure, or reject any and all bids, or to accept the bid from the lowest most responsible and responsive bidder as exclusively determined by the Owner. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. No Bidder may withdraw a bid within 60 days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the Owner and the Bidder determined by the Owner to be the lowest most responsible and responsive.

Bid Results

Water / Sewer

$823,295.00

Public - City

Site Work

4

6

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
114
Bidding Soon
1,171
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2025

September 8, 2025

Project location map

Multiple Locations, Greenwood, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.