BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 28, 2026 at 8:00 PM

Updated June 5, 2026

Site work for a power facility in Charlotte, North Carolina. Completed plans call for site work for a power facility.

Electrical Grid Automation - Phase 1 Work includes new medium voltage switchgear and replacement padmount switchgear for SUB SW-1 within the existing main substation yard providing power to most of campus. The scope shall include phased installation of the new switchgear to be fed from the existing Duke Energy transformer secondary and serve the replacement padmount switchgear and existing to remain padmount switchgear. Bids will be received for single prime contract. All proposals shall be lump sum. The Work consists of the following, but is not limited to: 1. Install new switchgear SUB SW-MAIN within existing substation yard. 2. Disconnect existing feed from existing overhead air switches to existing switchgear SUB SW-2. 3. Provide medium voltage cabling to feed SUB SW-MAIN from existing overhead air switches. 4. Provide medium voltage cabling to re-feed SUB SW-2 from SUB SW-MAIN. 5. Disconnect existing feed from existing overhead air switches to existing switchgear SUB SW-1. 6. Replace existing SUB SW-1 with new switchgear. Disconnect existing campus feeders from switchgear and re-terminate to new switchgear. 7. Provide medium voltage cabling to feed SUB SW-1 from SUB SW-MAIN. 8. Provide underground raceways for routing new medium voltage cabling. 9. Provide concrete pads for new electrical equipment. 10. Provide grounding system within substation yard. 11. Provide work to integrate relays and/or meters of new electrical equipment into existing BAS. 12. Provide start-up, testing and commissioning of new electrical equipment. All questions must be submitted by on 05/15/2026 at 5:00PM as per Addendum 4, Submit questions in writing via email to lsanders@aeieng.com. Responses will be in the form of addenda. Addendum will be issued May 6th , 2026 by 5:00PM. Doc.Note- Complete plans, specifications and contract documents will be open for inspection in the offices of: - UNC Charlotte Facilities Management, 9151 Cameron Blvd, Charlotte, NC 28262 - Affiliated Engineers, Inc, 1414 Raleigh Rd, Suite 305, Chapel Hill, NC 27517 MBE (10%) Completion-952 consecutive calendar days

Post-Bid

Power Plant

$1,350,000.00

Public - State/Provincial

Site Work

18

16

16

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
112
Bidding Soon
1,925
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2026

June 24, 2026

Project location map

9151 Cameron Blvd, Charlotte, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.