BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

This is a service / maintenance or supply contract in Mont-Tremblant, Quebec. Contact the soliciting agency for additional information.

Reference number: 20084524 Deadline for receipt of complaints 2025-07-28 Electronic tender submission accepted Yes, via SEAO, with two documents Expected duration of the contract without options (in months) 3 The Ville de Mont-Tremblant is requesting tenders for professional services from a consulting engineering firm for the preparation of a study to modify the management plan for water retained at the Lac Tremblant dam. The dam is located on the Cache River at the outlet of Lake Tremblant in the Laurentians. Lake Tremblant, which covers an area of 9.26 to 9.65 km2, is located in the Laurentides Regional County Municipality (RCM). The shores of the lake are bordered by numerous residences, holiday homes and tourist facilities, including the Tremblant Resort. The Lac Tremblant dam (X0005385) is owned by the city of Mont-Tremblant. Major refurbishment work was undertaken on the dam in 2016, following the dam safety assessment carried out in 2013. The work involved repairing a leak at the old water intake and stabilizing the dam's spillway and gate. Several lakefront residents have informed the Ville de Mont-Tremblant of an increase in the lake's water level. The Ville wishes to consider the possibility of controlling the water level using the truss gate to prevent the lake levels from rising. BBA has been commissioned to prepare a water management plan for the dam on Lake Tremblant. The main objective of this study is to carry out hydrological and hydraulic analyses to assess the possible effects of modifying the level of the Lac Tremblant dam and, consequently, to prepare a water management plan for the lake. TIMETABLE - Awarding of the contract: Week of 8 September 2025 - Delivery of preliminary hydrological modelling and dam stability report: 21 November 2025 - Delivery of final modelling report: 30 January 2026 - Submission of the application to modify the water retention plan: 30 January 2026

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
447
Active Projects
211
Bidding Soon
2,939
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2026

Project location map

To Be Determined, Mont-Tremblant, QC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.