Site work for a mixed-use development in Worsley, Alberta. Conceptual plans call for site work for a data center facility; and power facility.

Development of a 650MW data center within the Woodland Cree First Nation. The data centre will be powered by a 400 MW natural gas facility as the site is located near natural gas supplies, reservoirs for carbon capture and storage, fiber optic networks, and water supplies. The Project will provide on-site power generation for the data center, which will initially be built in two phases of 200 MW blocks. The Power Plant will initially be built as a 400 MW natural gas facility using simple cycle natural gas turbine technology and then be upgraded in a future phase to add an additional 250 MW heat recovery generator. Mihta Askiy Datacenter, a company majority-owned by the Woodland Cree, will acquire a partially completed power plant, its associated land, and equipment. This will be repurposed and combined with a data center. TIMELINE: Project is in development. Majority of the equipment has been procured, including two (2) 200MW Siemens Energy Turbines. Power generation is anticipated in mid-2027. Further details and project schedules may be confirmed mid-2026. *Cost is unreleased.

Conceptual

Data Centers

$8,000,000,000.00

Public - Federal

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
0
Bidding Soon
12
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2026

Project location map

Township Rd 854, Worsley, AB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.