Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 18, 2025 at 8:00 PM
Updated September 24, 2025
Site work for a water / sewer project in Chicago, Illinois. Completed plans call for site work for a water / sewer project.
The project involves repairing a sewer line at the Metropolitan Correctional Center (MCC) Chicago. The scope includes replacing approximately 75 linear feet of existing 8-inch clay sewer line with 8-inch by 8-inch heavy cast iron pipe. The work will be conducted in a secured, GSA-operated courtyard and requires precise utility locating, excavation to a depth of 6 feet, trench shoring, and protective barricades. All pavers and landscaping materials will be removed and restored to their original condition upon completion. The sewer system must be tested and backfilled after successful installation. Work must be performed with minimal downtime, and MCC will coordinate institutional water shutdown and restoration. All work must comply with local, state, and federal regulations. Contractors are required to attend a pre-work meeting to coordinate with on-site staff prior to beginning work. The performance period is 38 calendar days from the issuance of the notice to proceed. Location: Metropolitan Correctional Center (MCC) Chicago, 71 W. Van Buren Street, Chicago, IL 60605. Any questions relating to the solicitation after the closing of the pre-bid conference/site visit shall be sent in WORD FORMAT to Luke Bonner, Contracting Officer, via email at lbonner@bop.gov. In order to provide sufficient response time prior to the bid due date, the Government is establishing that questions about the solicitation be submitted no later than Friday, September 5, 2025 at 11:00 a.m., CDT. Answers will be posted via amendment on SAM.gov along with site visit meeting minutes the estimated magnitude of the project lies between $100,000 and $250,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Water / Sewer
$250,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 23, 2025
October 23, 2025
71 W Van Buren St, Chicago, IL
Related To This Project
Chicago, IL
--
Repair and Replacement Services of Metra Locomotive and Support Vehicle Fueling Facilities - 5848923
Chicago, IL
Bid Date: Aug 05 2025
Chicago, IL
Bid Date: Jul 30 2025
Chicago, IL
Bid Date: Jul 23 2025
Chicago, IL
--
Chicago, IL
Bid Date: Aug 12 2025
Chicago, IL
Bid Date: Aug 06 2025
Chicago, IL
Bid Date: Aug 13 2025
Chicago, IL
--
Chicago, IL
Bid Date: Jul 22 2025
Chicago, IL
--
Chicago, IL
Bid Date: Aug 18 2025
Chicago, IL
Bid Date: Aug 11 2025
Chicago, IL
Bid Date: Aug 01 2025
Chicago, IL
Bid Date: Jul 14 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
