BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2025 at 7:00 PM

Updated December 4, 2025

Site work and paving for a bridge / tunnel in Port Moody, British Columbia. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Seismic retrofit and rehabilitation of two parallel bridges on Barnet Highway, spanning the Canadian Pacific Kansas City Limited (CPKC) Rail right-of-way. TIMELINE: Request for proposals seeking a qualified structural design consultant to provide comprehensive design services is closed, preferred proponent is selected. Further update in late spring 2026, upon approvals.

Design

Bridges / Tunnels

$2,412,300.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
65
Bidding Soon
2,319
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.