BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 11, 2025 at 8:00 PM

Updated September 12, 2025

Site work and paving for a mixed-use development in Houston, Texas. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Proposed 0.50 MGD WWTP expansion. Total plant capacity to 0.65 MGD average flow. The proposed expansion includes aeration basins, digester basins, clarifier, disinfection basin, blowers driveway and sidewalks. Proposed approximately 1,500 LF of 18" RCP stormsewer to existing detention outfall. The deadline to ask questions is 8/12/2025 12:00 AM CST All questions about the meaning or intent of the Bidding Documents are to be directed to Engineer. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda posted online All parties recorded by the Engineer as having received the Bidding Documents will be notified of the addendum. Questions received less than 72 hours prior to the date for opening of Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effec A cashier's check or bid bond in the amount of 5% of the total bid amount must accompany each bid. The successful bidder will be required to provide a performance bond, a payment bond, and a maintenance bond for the full amount of the contract. The Owner reserves the right to reject any or all bids. Proposed 0.50 MGD WWTP expansion. Total plant capacity to 0.65 MGD average flow. The proposed expansion includes aeration basins, digester basins, clarifier, disinfection basin, blowers driveway and sidewalks. Proposed approximately 1,500 LF of 18" RCP stormsewer to existing detention outfall. The scope of our services is as follows: Drilling one (1) boring to 30 feet at the Aeration/ Digestor area. Drilling one (1) boring to 55 feet at the Clarifier area. Drilling one (1) boring to 40 feet at the Lift Station area Drilling and sampling two (2) borings to a depth of 5 feet each at parking areas. Obtaining continuous soil samples to a depth of 12 feet, and then at five (5) foot intervals thereafter to the borings' termination depths. Measure the depth of groundwater for every boring after completion of drilling and approximately 24 hours after drilling.

Bid Results

Water / Sewer

$6,123,550.00

Public - County

Paving, Site Work

46

28

74

10

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
4
Bidding Soon
2,020
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2025

September 12, 2025

Project location map

12211 Peek Rd, Houston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.