BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a water / sewer project in Austin, Texas. Completed plans call for site work for a water / sewer project.

Project Name: Distribution Getaway Duct Bank Bore at East Village substation Located at: 4605 ½ E. Howard Lane next to the East Village Substation Scope of Work: The Work shall include furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of approximately 342 linear foot 36-inch jack and bore with 12-5 inch carrier pipes (grouted within the casing pipe) in ground water conditions. The work also includes 386 linear feet of 12-5 inch open cut duct bank, 79 linear feet of 2-5 inch open cut duct bank, two 12'x12' manholes and typical erosion and sedimentation control and revegetation. Austin Energy will install the conductors at the project completion.

GC Bidding

Water / Sewer

$1,114,570.00

Public - City

Site Work

15

15

28

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
299
Active Projects
103
Bidding Soon
2,184
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2026

July 13, 2026

Project location map

To Be Determined, Austin, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.