Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 7, 2025 at 8:00 PM
Updated August 8, 2025
Site work for a water / sewer project in Leavenworth, Washington. Completed plans call for site work for a water / sewer project.
For furnishing the necessary labor, materials, equipment, tools, and guarantees thereof to construct the WWTP Clarifier Improvements. The work specified consists of furnishing all labor, materials, and equipment necessary for the installation of an Owner-furnished 46-foot clarifier mechanism, as shown on the Plans, and hereinafter specified, at the existing wastewater treatment plant site. Work shall include, but not be limited to, the following: Install City-provided clarifier mechanism including the sludge truss scraper assembly, weir trough assembly, effluent pipe, thrust bearing, guide bearing, sludge scraper drive shaft and steady shaft. Sandblast and paint bridge, handrail, skirt supports, scum mechanism an all other appurtenances as shown on the Plans. Provide testing, commissioning, and training as specified herein. Provide all associated work as shown on the Plans and specified herein, for a complete and workable system. The Work shall be Substantially complete within 30 working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and Contract Plans for this project and any addenda issued thereto that are on file at the office of the City Clerk, City Hall, Omak, Washington. Proposals are to be submitted only on the form provided with the Bid Documents. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the "City of Omak" and in an amount of not less than five percent (5%) of the total Proposal amount. Financing of the Project has been provided by the City of Omak. The City of Omak expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities in any Proposal.
Bid Results
Water / Sewer
$204,956.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 5, 2025
September 4, 2025
To Be Determined, Leavenworth, WA
Related To This Project
Leavenworth, WA
Bid Date: Aug 28 2025
Leavenworth, WA
Bid Date: Oct 29 2025
Leavenworth, WA
Bid Date: Nov 24 2025
Leavenworth, WA
Bid Date: Nov 19 2025
Leavenworth, WA
Bid Date: Jan 14 2026
Leavenworth, WA
--
Leavenworth, WA
--
Leavenworth, WA
--
Leavenworth, WA
Bid Date: Jun 05 2025
Leavenworth, WA
--
Leavenworth, WA
Bid Date: May 07 2025
Leavenworth, WA
Bid Date: Apr 23 2025
Leavenworth, WA
Bid Date: Apr 09 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
